|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-08-08-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2013
>
2013-08-08-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:58 PM
Creation date
8/25/2014 3:04:42 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee <br />4.67 RCN Fiber <br />8/8/13 <br />DPF explained that the RCN fiber service to each school needed to be re-routed to avoid the old boiler room to allow for new <br />classroom construction. <br />Motion to approve $6000 requisition to RCN for the cost to relocate RCN fiber services to bridge & Bowman schools. <br />Motion: Carl 2: Joe Vote: 6-0-0 <br />nd <br />4.68 Additional Library work <br />8/8/13 <br />DPF outlined additional work requested to encase the existing wood paneling at the bridge & Bowman Libraries. <br />Motion to approve proposal from Shadrack construction for sheetrock and paint over Library paneling at both schools in the <br />amount not to exceed of $5,500.00 <br />Motion: Dick 2nd: Chuck Vote: 6-0-0 <br />4.69 Additional Library work <br />8/8/13 <br />Motion to approve Design Partnership additional services for $9,500.00 for Professional services for spray insulation project for <br />phase 2 areas at Bridge & Bowman. <br />Motion: Chuck 2nd: Carl Vote: 6-0-0 <br />7.0 Estabrook Elementary <br />7.66 Change Order Detail <br />11/8/12 <br />PBC raised a question regarding the percentage mark ups to change orders (10% / 5%) and what happens on negative change <br />orders? CP to discuss at next meeting. <br />7.70 Flooring <br />11/8/12 <br />Discussion on variances in the overall system depth of the various manufacturers for the Stage and gym flooring products as <br />specified. Final discussion was to base the sub floor elevation on the deepest system requirement and incorporate transition strips <br />if / where needed to accommodate final variance based on final flooring choice. <br />7.80 Transfer <br />2/14/13 <br />Motion to approve $1,447,323 in funds from contingency line to Construction line based upon approval of Estabrook GMP. <br />Motion: Eric 2nd: Carl Vote: 5-0-0 <br />5/9/13 <br />Motion <br />and extension (service) cost, and authorization of $79,508 to National Grid for gas line service upgrade from Grove Street to new <br />building. <br />Motion Phil 2 Chuck Vote 6-0-0 <br />nd <br /> Page 3 of 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.