Lexington Permanent Building Committee <br />7.84 Project Update <br />6/13/13 <br />PBC started with a project tour at Estabrook through the construction site. Committee was updated on the status of the LEED <br />certification and currently school is tracking towards Silver as planned. MSBA reimbursement of 2% if LEED Silver is met is @ <br />$600,000.00. <br />7/11/13 <br />Collaborative Partners presented various photos of construction areas of the new building. New sub contractors on board. 70 <br />workers on site daily. Curtain walls due on site in a couple of weeks, Metal panels due in August. Windows have been delivered. <br />Main roof is 90% tight. Water piping is 60% complete on floors 2 and 3, 40% complete on the first floor. Half of the light fixtures are <br />on site. Monday 7/15/13 National Grid will be on site for the gas installation. Tuesday 7/23/13 the water will be tied in. Everything <br />is considered on schedule. <br />PBC has requested FF&E updates for August Meeting. PBC would like to see what is being proposed prior to going out for bid. <br />DiNisco will bring to next meeting. <br />8/8/13 <br />CP made presentation on project status <br />Stairs being enclosed, windows being installed, curtain walls underway, hw/cw piping 2 & 3 flrs. insp <br />hoisted, concrete pans being poured in stairs, water testing on windows complete, binder course next week. <br />PBC asks is their a contingency plan if Shawmut fails? <br />7.85 Interior Colors <br />4/11/13 <br />Ken DiNisco stated that a final discussion should take place soon on interior colors. <br />Ken will work directly with Carl and Eric to schedule a time too meet and review same, perhaps as early as next week. Ken will be <br />sure to include Sandy T. in those discussions. <br />5/9/13 <br />Carl attended meetings with the Architects and school Principals to review interior colors. <br />7.87 Application for Payment <br />7/11/13 <br />Motion to approve application for payment # 12, in the amount of $2,014,812.67 from Shawmut Construction as approved and <br />recommended by the Architect of Record, DiNisco Design Partnership and Owners Project Manager Collaborative Partners. <br />Motion Eric 2 Dick Vote 5-0-0 <br />nd <br />8/8/13 <br />Motion to approve Application for Payment #13, in the amount of $2,815,589.25 from Shawmut Construction as approved and <br />recommended by the Architect of Record, DiNisco Design Partnership and Owners Project Manager Collaborative Partners. <br />Motion: Jon 2: Carl Vote: 6-0-0- <br />nd <br />7.89 PCO Log <br />5/9/13 <br />Motion to accept the following PCOs in the following amounts for inclusion into Change Order #1 <br />PCO 53 Revised Door Widths per CCD 1: $935.00 <br />PCO 54 Revised Tel/com Handhole size per CCD 2: -$6,291 <br />PCO 60 Revised Window color per CCD 6: $5,090 <br />PCO 61 Revised Door Hardware per CCD 5: $4,539 <br />PCO 65 Revised Stair Nosing insert per CCD 4: $5,808 <br />PCO 67 Existing condition issue at Grove St. drainage: $3,104 (CCD 3) <br />Motion Phil 2 Dick Vote 6-0-0 <br />nd <br />6/13/13 <br />PCO #62 Place Greenhouse on emergency power: $521.00 <br />PCO #68 Refrigerator Model discontinued added an icemaker to nurses: $650.00 <br />PCO #69 RFI from plumber to plumb chases: $2771.00 <br /> Page 4 of 5 <br /> <br />