Lexington Permanent Building Committee <br />4.0 Bridge & Bowman Renovation Projects <br />4.59 TLT Payment requisition <br />7/11/13 <br />Motion to approve application for payment #16, in the amount of $456,856.60 from TLT Construction as approved and <br />recommended by the Architect of Record, Design Partnership of Cambridge. <br />Motion Eric 2 Dick Vote 6-0-0 <br />nd <br />8/8/13 <br />DPC presented and reviewed TLT Application for Payment no. 17 in the amount of $2,084,047.91. <br />Motion to approve Application for Payment #17, in the amount of $2,084,047.91 from TLT Construction as approved and <br />recommended by the Architect of Record, Design Partnership of Cambridge, subject to the satisfactory submission of release of <br />liens from project subcontractors and resolution of the demand for direct payment made by general mechanical contractors, as <br />approved by Town counsel. <br />Motion Jon 2 Dick Vote 6-0-0 <br />nd <br />4.62 Update from DPC and Daedalus <br />6/13/13 <br />Bob White from Daedalus updated PBC on TLT scheduling. April and May were very productive months. He feels CPM schedule is <br />good with a critical path that can be monitored. Currently windows are almost completely installed. Progress in Phase 2 is excellent. <br />7/11/13 <br />PBC toured the Bridge school and noticed the significant improvements on site and cleanliness of the areas. Progress in the work <br />was easily observed. TLT representatives were on site for the tour of the phase 2 area. <br />DPC discussed the report from Cavanaugh Tocci Associates (dated July, 2013) it was determined sound levels around the site were <br />minimal and well under what is allowed for in the ordinance. PBC directed DPC to obtain credit proposal and to notify TLT that <br />steel reinforcing for acoustic panels at the roof of both Bridge and Bowman are not needed. <br />8/8/13 <br />DPC and DPF updated committee on project status. Several areas complete and in process of being turned over. Mods to be <br />completed ob 8/23/13. remainder of classrooms expected the beginning of next week. Expectations are that student areas will <br />be ready for occupancy by the start of school. Gymnasium may not be 100%. Last two classrooms are due 10-1-13. <br />A demand for direct payment has been received and DPF is working with Town counsel to resolve. <br />Commissioning is ongoing <br />Dave Capaldo from DPC leaving firm end of August. A replacement to be identified. <br />PBC asks DPF to investigate with Town Counsel about getting a release of liens from TLT. <br />Question raised on a drinking fountain, DPF asked to get a price on a freestanding drinking fountain. <br />4.64 Change Order <br />7/11/13 <br />Motion to approve Change Order #16 in the amount of $38,754.00 which includes COR # 178, 181, 184, 185,187 as approved and <br />recommended by the Architect of Record, Design Partnership of Cambridge. <br />Motion Eric 2 Jon Vote 6-0-0 <br />nd <br />8/8/13 <br />Motion to approve Change Order #17 in the amount of $70,549.00 which includes COR #196, 189, 206, 202, 198, 190A, 197 as <br />approved and recommended by the Architect of Record, Design Partnership of Cambridge. <br />Motion: Carl 2nd: Dick Vote: 6-0-0 <br />4.66 EBI additional testing <br />6/13/13 <br />Motion to approve Additional Service amendment to Design Partnership of Cambridge to include scope of EBI Consulting for <br />hazardous materials abatement monitoring and sampling in the amount not to exceed $80,000.00. <br />Motion Phil 2 Eric Vote 6-0-0 <br />nd <br /> Page 2 of 5 <br /> <br />