Lexington Permanent Building Committee <br />4.57 Project Update by Daedalus and DPC <br />3/14/13 <br />Bob white provided an update to the PBC on the work being completed by TLT as compared to the schedule that had been <br />developed. Daedalus reports that TLT is maintaining their schedule and completing tasks per schedule milestones. <br />D2 area is scheduled for completion at end of April school vacation week. <br />Daedalus also updated committee on updated schedule prepared by TLT. DPF did not print copies but emailed the schedule to the <br />PBC just prior to the meeting. Predecessors and successors along with critical path lines have been added to the schedule. An <br />electronic / live version was received and we hope to have the scheduling consultants report on further schedule detail by next <br />meeting. <br />4.59 TLT Payment requisition <br />5/9/13 <br />Motion to approve Payment requisition #14 to TLT Construction in the amount of $514,242.10 <br />Motion Carl 2nd Eric Vote: 7-0-0 <br />6/13/13 <br />Motion to approve application for Payment # 15, in the amount of $369,354.61 from TLT Construction as approved and <br />recommended by the Architect of Record, Design Partnership of Cambridge. <br />Motion Eric 2 Dick Vote 6-0-0 <br />nd <br />Motion to approve interim application for payment representing stored materials, as is allowed by contract documents, which <br />was previously removed from application #15, without exceeding value originally requested. <br />Motion Eric 2 Dick Vote 6-0-0 <br />nd <br />4.62 Update from DPC and Daedalus <br />4/11/13 <br />Daedalus provided update report on status of construction activity or work in place, relative to the schedule prepared by TLT. <br />Daedalus reports that the current work is on schedule for the D2 or current work. Deadalus meets each week with one of the <br />construction superintendents tracking completed work with the schedule. <br />Daedalus sent a live copy of TLT summer schedule which carries the project to completion, to a scheduling consultant for a more <br />detailed evaluation. This evaluation will check predecessors and successors and verify that the logic of the schedule truly works. <br />Unfortunately this report was not available for this evening but the will forward the report as soon as it is available. <br />DPC reports that there are items of work that are called out in the summer schedule that are being completed now in an effort to <br />get the project ahead of schedule. <br />D2 area of project scheduled to be complete after April school vacation week. <br />5/9/13 <br />Bill Gallagher updated the committee on the project and progres <br />diagram for summer work, school start and potential alternate plans is acceptable. Scheduling and coordination for the move and <br />summer work is in progress. <br />6/13/13 <br />Bob White from Daedalus updated PBC on TLT scheduling. April and May were very productive months. He feels CPM schedule is <br />good with a critical path that can be monitored. Currently windows are almost completely installed. Progress in Phase 2 is excellent. <br /> Page 3 of 8 <br /> <br />