Lexington Permanent Building Committee 4-11-13 <br />Motion to approve moving quote under state contract FAC 78 for phase 2 moves in the amount not to exceed $126,540.00 for <br />the final moves of the Bridge & Bowman project. <br />Motion Carl 2 Joe Vote 7-0-0 <br />nd <br />Motion to approve Design Partnerships additional services for sound level testing in the amount of $2,500.00 as proposed. <br />Motion Carl 2 Joe Vote 7-0-0 <br />nd <br />4.66 Cancellation of VAT work <br />4/11/13 <br />DPC presented a proposed Credit Change order to the PBC that would eliminate the removal and replacement of corridor flooring <br />at the Bridge school. TLT never completed this scope of work in phase 1 and would be challenged to complete it in this phase along <br />with phase 2 work. By crediting this work TLT will also credit the abatement of caulking between masonry walls and steel columns <br />that exists behind the lockers in these hallways. The lockers must be removed to replace the floor and that is when they were <br />going to abate the caulking. (The caulking is contained, non-friable, and not a danger. Any column caulking that can be removed <br />with locker replacement will still be completed. The credit from TLT for this work will be $63,237.00. The Town will pursue <br />rebidding this work next summer. <br />Motion to accept change proposal #169 as a credit in the amount of $63,237.00 removing VAT/VCT corridor flooring from the <br />Bridge Scope along with related column caulking abatement behind corridor lockers. <br />Motion Carl 2nd Dick Vote 5-0-0 <br />7.0 Estabrook Elementary <br />7.66 Change Order Detail <br />11/8/12 <br />PBC raised a question regarding the percentage mark ups to change orders (10% / 5%) and what happens on negative change <br />orders? CP to discuss at next meeting. <br />7.67 Masonry Mock-up <br />11/8/12 <br />Masonry mock up to be established in field for review. PBC requested related exterior materials samples to be present as well. <br />2/14/13 <br />Discussion on the selection of exterior colors, PBC voiced concern over mock up wall not be erected. <br />Shawmut to expedite mock up wall for onsite review. <br />DPF added that a delay on color selections will likely incur delay costs so Design Team and CM need to clarify schedule needs and <br />communicate with the Town effectively on this issue. <br />7.70 Flooring <br />11/8/12 <br />Discussion on variances in the overall system depth of the various manufacturers for the Stage and gym flooring products as <br />specified. Final discussion was to base the sub floor elevation on the deepest system requirement and incorporate transition strips <br />if / where needed to accommodate final variance based on final flooring choice. <br /> Page 6 of 10 <br /> <br />