Laserfiche WebLink
Lexington Permanent Building Committee 4-11-13 <br />7.75 Final GMP Discussion <br />1/3/13 <br />Shawmut presented a document dated 1/3/13 and titled Draft GMP Reconciliation sheet. This document was presented by <br />Shawmut and each line was reviewed with PBC. <br />Paul from CP visited the Shawmut office and reviewed all the non trade bids and the process used in developing them. Cp was very <br />satisfied with the documentation and process Shawmut used in obtaining the non-trade bids. <br />There is a $35,000 allowance in the GMP that the town can eliminate by change order if we chose not to have Shawmut coordinate <br />landscaping work. <br />Shawmut discussed an overrun to their costs for Pre-construction work in the amount of $95,000. This figure was included in some <br />below the line costs on their GMP reconciliation sheet dated 1/3/13 and presented at this meeting. <br />After brief discussion the PBC was not supportive of including these costs in the GMP at this time and advised Shawmut that these <br />costs could be discussed at an appropriate time in the future. <br />GMP line item approved by state is $31,145,000. State is aware we are trending over and will adjust 3011 form accordingly; delta in <br />GMP over 31,145,000 may not be reimbursable. <br />For approval of the GMP <br />Line Items from reconciliation sheet to be removed: <br />$95,000 for preconstruction overage (not approved) <br />$46,650 Builders risk insurance (funded elsewhere in the budget) <br />Add in to GMP <br />$61,000 for specified stage and gym flooring as specified <br />Motion to approve the Shawmut Design & Construction GMP as outlined in the 1/3/13 GMP Reconciliation sheet prepared by <br />Shawmut, less the preconstruction overrun line of $95,000, less builders risk insurance line of $46,650, with an addition of a line <br />for $61,000 to cover the specified Stage and Gym flooring material for a GMP in full compliance with the plans & specifications <br />prepared by DiNisco Design Partnership for a revised total of $32,795,932.00 for the Estabrook School Project. <br />Motion: Joe 2: Eric Vote: 6-0-0 <br />nd <br />Motion to approve all filed sub bids received and as documented in the January 3, 2013 Shawmut Design and Construction <br />comparison with Trade Bids Table presented this evening by Shawmut in the amount of $12,289,833.00 which is with the <br />exception of the elevator bid, which the Town of Lexington is requesting Shawmut to vet the low bid and if not within <br />compliance with the documents and budget, that Shawmut bid on open market in compliance with MSBA and statutory <br />requirements. <br />Motion: Chuck 2: Carl Vote: 6-0-0 <br />nd <br />7.76 Shawmut Payment Request <br />1/10/13 <br />Motion to approve Shawmut Monthly Requisition #6 in the amount of $587,139.00 <br />Motion 2nd Vote <br />7.77 Reimbursable expense <br />1/10/13 <br />DPF Submitted Request for Approval of DiNisco Reimbursable Expense authorization #19 for Weber Engineering Associates LLC, <br />Geotechnical Engineering services during Construction, in the amount of $11,583.00 <br />Motion to Approve DiNisco Reimbursable Expense authorization #19 for Weber Engineering Associates LLC, Geotechnical <br />Engineering services during Construction, in the amount of $11,583.00. <br />Motion: Eric 2nd: Chuck Vote: 6-0-0 <br /> Page 7 of 10 <br /> <br />