Laserfiche WebLink
APPROPRIATION COMMITTEE REPORT TO NOVEMBER 2011 STM <br /> <br /> <br />The Capital Expenditures Committee report provides additional information and perspective on the ra- <br />2 <br />tionale for and composition of the project. The report is available on the Town website. <br /> <br /> <br />As noted above, Town Meeting has already appropriated a total of $1,030,000 for D&E work in prepara- <br />tion for the construction phase of the project. The Town has raised these funds through short-term bor- <br />rowing; these funds have largely been spent or committed in preparing project plans,s- <br />timates, etc. If Town Meeting appropriates the construction funds and the debtsion referendum is <br />successful, the short-term notes will be re-characterized as exempt debt and both the principal and interest <br />will be fully repaid in FY13 outside the tax levy. If the project does not receive the necessary Town Meet- <br />ing and referendum approvals, the notes will be rolled over and the debt will be repaid over multiple years <br />within the levy. <br />If Town Meeting approves this Article and the exclusion of the p <br />$21,670,000 in funds needed for the construction phase would be raised through the issuance of twenty- <br />year bonds. The first payment on these bonds would be due in FY14. Principal payments would be con- <br />stant through the life of the bonds. The first interest payment e sub- <br />sequent payments would then decrease over the 20-year period. Payments would continue through <br />FY2033. The projections shown below assume an interest rate of 4 <br />successful bond offerings completed by the Town. <br />Table 1 shows the Town’s estimated debt service payments for the first 10 years of a 20-year term. The <br />table includes data for the Bridge and Bowman projects as well as the pending Estabrook reconstruction <br />project that will not be considered by Town Meeting until the 2012 Annual Town Meeting. Taxpayers <br />would see the greatest financial impact in FY14 and declining impact from this debt over the 20 years. <br /> <br />Existing <br />Fiscal Bridge/Bowman Estabrook <br />Exempt Debt Total <br />Year Debt Service Debt Service <br />Service <br />2012 $5,728,255 — — $5,849,706 <br />2013 $4,792,384 $1,049,000* — $5,841,384* <br />2014 $4,663,204 $1,950,300 $2,295,000 $8,908,504 <br />2015 $4,324,377 $1,906,960 $2,244,000 $8,475,337 <br />2016 $4,189,516 $1,863,620 $2,193,000 $8,246,136 <br />2017 $3,672,145 $1,820,280 $2,142,000 $7,634,425 <br />2018 $3,540,570 $1,776,940 $2,091,000 $7,408,510 <br />2019 $3,303,431 $1,733,600 $2,040,000 $7,077,031 <br />2020 $3,151,065 $1,690,260 $1,989,000 $6,830,325 <br />2021 $2,977,522 $1,646,920 $1,938,000 $6,562,442 <br />2022 $2,869,925 $1,603,580 $1,887,000 $6,360,505 <br />2023 $2,750,703 $1,560,240 $1,836,000 $6,146,943 <br /> <br />Notes: <br />(1) * – Includes repayment of $1,030,000 in principal and approximately $19,000 in interest on the short-term debt issued for the <br />Bridge/Bowman D&E. <br />(2) The Estabrook debt service was estimated assuming a loan of $25,500,000 (total cost less Massachusetts School Buil <br />Authority reimbursement) over 20 years with a 4% interest rate. <br /> <br />Table 2 shows the estimated impact of the exempt debt for a “tax bill on a residence of average value” <br />over the first 10 years of the 20-year term. The dollar amounts are the component of a residential <br />tax bill that could be attributed to the exempt debt for a resident whose property was assessed at $697,000 <br />in FY11. The total tax bill in FY11 for this “average taxpayer” was $9,936. <br /> <br />2 <br /> CEC Report to the 2011 STM - <br />http://www.lexingtonma.gov/towngovernment/CECfinalReport2011STM. <br />Page 7 <br /> <br />