Laserfiche WebLink
Panasse Hangen Brustlin,Inc. <br /> Site Orientation <br /> The Greenway Project Area is an approximately five-mile long <br /> area located in the western portion of the Town of Lexington(see <br /> Figures la,lb and 1c).Boundaries of the Project Area are the <br /> Burlington town line to the north,Interstate Route 9S/128 to the <br /> east,the Cambridge Reservoir and Route 2 to the south,and the <br /> Bedford and Lincoln town lines to the west.An NSTAR power line <br /> easement runs the length of the Project Area. <br /> The Project site consists of a linear series of open spaces aligned <br /> in a north-south orientation along the NSTAR power line ease- <br /> ments,as depicted in Figure 1c.Town of Lexington Conservation <br /> Areas within the larger project area include:Cranberry Hill, <br /> Katandin Woods,Tophet Swamp,Simonds Brook and the Paint <br /> Mine Conservation Areas.The site is transected by a number of <br /> major streets,including the following(from south to north): <br /> ► Lincoln Street(bisecting the Cambridge Water Department <br /> f`•r. ,` Land) <br /> $ ► Massachusetts Avenue,Old Massachusetts Avenue,Marrett <br /> l Road and Airport Road(all located within the Minute Man <br /> r National Historical Park) <br /> ► Wood Street,which connects to Hartwell Avenue <br /> ► Bedford Street,which intersects Rt.128 at interchange#31 <br /> ► Grove Street <br /> ► Turning Mill Road <br /> The most significant landmark within the Project Area is the <br /> Minute Man National Historical Park(MMNHP).Other landmarks <br /> within the Project Area include:Cambridge Reservoir,Minuteman <br /> Regional High School,Minuteman Research Park,the Town of <br /> Lexington Composting Facility,Minuteman Bikeway,Lexington <br /> Industrial Park,Westview Cemetery,Boston Sports Club,and the <br /> �7-�✓ Estabrook School. <br /> The Master Plan seeks to strengthen trail connections both in a <br /> north—south orientation,primarily within the NSTAR power line <br /> easement,and in an east—west orientation.Existing trail net- <br /> works and access points are presented in Figure la. <br /> The central focus of the Greenway will be the connection <br /> between the Minuteman Bikeway and the Battle Road.This <br /> approximately 2-mile long multi-use trail will herein be referred to <br /> as the"Minuteman Connector"which is proposed for the area <br /> herein referred to as the"Central Section"This plan also aims to <br /> improve connectivity and trail access in the other areas of the <br /> Project Area,herein to bereferred to as the"Northern Section"and <br /> West Lexington Greenway Master Plan 5 <br />