|
Lexington Home Page
|
Help
|
About
|
Browse
Search
MasterPlan_03_June-2012
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Other Documents
>
MasterPlan_03_June-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 6:35:01 AM
Creation date
1/17/2013 3:38:47 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
GCC - Greenways Corridor Committee - West Lexington Greenway Master Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
iVanasse Hangen Brustlin,Inc. <br /> trails that would run through the West Lexington Greenway <br /> Project area,with the main trail connecting the Minuteman . <br /> Bikeway to the Battle Road Trail,with a series of smaller trails <br /> feeding into this main trial.Suggested trail types,width,pave- <br /> ment materials,boardwalks and bridges were presented.As with �+ <br /> other public meetings,public comment was encouraged,and <br /> numerous citizens provided ideas and additional recommenda- <br /> . r <br /> tions that were taken into consideration when finalizing the plan s. <br /> F <br /> for this report. <br /> 4 � i <br /> 14 <br /> 7 <br /> 4 <br /> 1 <br /> f - <br /> -04 <br /> a <br /> 4 West Lexington Greenway Master Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.