Laserfiche WebLink
iVanasse Hangen Brustlin,Inc. <br /> trails that would run through the West Lexington Greenway <br /> Project area,with the main trail connecting the Minuteman . <br /> Bikeway to the Battle Road Trail,with a series of smaller trails <br /> feeding into this main trial.Suggested trail types,width,pave- <br /> ment materials,boardwalks and bridges were presented.As with �+ <br /> other public meetings,public comment was encouraged,and <br /> numerous citizens provided ideas and additional recommenda- <br /> . r <br /> tions that were taken into consideration when finalizing the plan s. <br /> F <br /> for this report. <br /> 4 � i <br /> 14 <br /> 7 <br /> 4 <br /> 1 <br /> f - <br /> -04 <br /> a <br /> 4 West Lexington Greenway Master Plan <br />