Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-09-27-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2012
>
2012-09-27-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:11 PM
Creation date
1/15/2013 8:47:23 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee <br />27 September 2012 <br />• Shawmut back on 7/12 with formalized plan of above. <br />Summary from this meeting. <br />• PBC would like to see a tabulation of how we went from $31.1 million to $35 million. <br />• RFW needs to advise Shawmut of PBC positions <br />• Eric thinks School Committee should support PBC in the Aesthetic issues as they don't involve educational issues. Cost <br />savings on exterior veneer. Jon agrees Aesthetic issues should not be school committee issues. <br />• PBC suggest if Shawmut is not at $31.1 at 7/12 meeting we should not continue any further discussion with them and <br />start talks with CTA. <br />Ask Kevin Batt (Legal Counsel) for advice, letter from awarding authority <br />Paul to give Shawmut Fogarty estimate and show them cost model we are striving for. <br />OPM can approach 2 nd CM and see if they want to negotiate if we are not proceeding with Shawmut. <br />7.44 Update <br />7/12/12 <br />Shawmut made presentation on GMP budget and proposes revised numbers that meet budget expectation at $31,150,670. <br />PBC discuss and agree 1 set of documents should be issued for pricing. Sept 1. for GMP on 9/15/12. <br />DiNisco disagrees with reduced design contingency. Contingency down to $1,000,000 not $1,200,000. <br />In presentation Shawmut outlined the following timelines: <br />Abatement February to mid April <br />Demo Mid April to mid May <br />Site Mid May to mid August <br />Logistics for spring 2014 and summer of 2014 concerning and will require further development and discussion. <br />Eric feels having <br />• Shawmut check the drawings is a good thing. <br />• Moisture mitigation is a big item and that it warrants a separate meeting. <br />• Schedule concern for spring 2014 and use of new bldg. with old bldg. still up and no new driveway. <br />Architects will provide a LEED Update at 60% CD. <br />7.47 Value Management Items <br />8/9/12 Items reviewed for determination <br />#15 Defer <br />#20 Barier One - $80,000 included in estimate so $278375 can not be deducted. <br />#25 &@ 26 <br />No <br />#39 <br />Hold <br />#58 <br />DDP to confirm scope <br />#62 / 62A <br />Yes -Alum. Feeders <br />#65 <br />No -Puts this school at disadvantage to others <br />#66 <br />Defer <br />#77 <br />No <br />#31A & B Net deduct $17,000 <br />#43 Yes <br />Motion to approve the above listed value management items from the project VM list dated 8/6/12 as amended affirming the VM <br />effort at approx $1,500,00. <br />Motion Phil 2nd Chuck Vote: 5-0-0 <br />7.48 Update on GMP development <br />8/9/12 <br />Tony from Shawmut reviewed options for GMP development <br />Option 1 per original RFP <br />Option 2 bid the filed sub early <br />Option 3 same as 2 but don't bid filed subs early <br />Page 4 of 6 <br />