Lexington Permanent Building Committee 31 May 2012 <br />RF Walsh presented an updated contract for services which combined PM and Site manager roles, bringing proposal from 4.5% to <br />3.73 %. <br />Motion: To approve RF Walsh contract in the amount of $1,162,000. <br />Motion: Peter Second: Dick Vote: 7 -0 <br />4/26/12 <br />Motion to amend 3/29/12 vote of OPM contract (originally approved at $1,162,000.), to include reimbursable expenses, cost <br />estimates, and other services for a revised total contract value of $1,233,400. <br />Motion: Jon Himmel 2 Eric Brown Vote: Unanimous <br />7.22 Fuel source for Generator <br />1/5/12 <br />Discussion on allowable fuel source, MB to follow up with fire department, for use of natural gas instead of diesel. <br />1/19/12 <br />Have verbal from fire department that natural gas is okay, waiting for verification in writing. <br />7.23 Historical Commission <br />1/5/12 <br />RFW and DDP will work with Historical Commission on any approvals necessary for demolition of existing Estabrook School <br />1/26/12 <br />RFW meeting on 2/9 with Historical Commission. <br />7.28 Designer Update for 3/29/12 <br />3/29/12 <br />DDP advises that MSBA formally accepted Schematic Design Submission <br />Final Grading plan due in from subs tomorrow <br />Food Service meeting recently conducted to inform designers of project needs <br />DDP presented a power point on overall updates, copy to file <br />Discussion on Building Materials — more involved conversation will happen at working group meeting <br />Discussed photos and materials use on other buildings <br />Materials being considered; Limestone, split face block, ground face block, cast stone, zinc panels, all natural colors. <br />DDP needs to do some sketch studies of elevations with some of the materials <br />Some opinions discussed for overall theory...... simple, not busy <br />Reviewed slight adjustments to floor plan to improve function, no change in GSF <br />Approx 500 seating capacity for performance space set up in cafeteria <br />Roof Membrane not yet determined <br />Cafeteria +/- 11 feet to underside of truss, 16 feet to deck <br />Gymnasium 24 feet to underside of deck <br />Glass and lighting require further discussion <br />7.30 Commissioning Agent award <br />3/29/12 <br />MSBA assigned Commissioning agent, contact needs to be made and a scope of services received. <br />4/12/12 <br />Discussion regarding scheduling a meeting with commissioning agent and schedule meeting. <br />7.31 Schedule through summer 2012 and Start of Building Construction <br />3/29/12 <br />It was discussed that a detailed schedule / timeline is needed leading into summer activities and enabling work. <br />Summer Recess for school is coming soon and is relatively short in duration as compared to amount of work that needs to take <br />place. <br />4/12/12 <br />Summer approvals, milestones and work goals need to be identified in schedule. <br />Site infill area, retaining wall, pavement expansion for temp parking, temp drainage structures. DDP expects early site package to <br />be drawn by end of the month. <br />Page 5 of 7 <br />