|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-09-17-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2018
>
2018-09-17-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:22 PM
Creation date
1/16/2019 8:50:19 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Man reviewed several comments that were made at the prior meeting.Mr.Man reported <br /> changes to the stormwater calculations to comply with the stormwater regulations.They will <br /> use a larger system to collect stormwater flow. <br /> Mr.Hamilton entered the comments by the Engineering Department into the record. <br /> Mr.Man continued to explain that 4 FENO bounds will be installed per the Commissions <br /> comments.Mr.Man provided detail of the improved connection from downspout to the <br /> retention system. <br /> Mr.Bitsko exclaimed that the detail of overflow is different than usual,but will however, <br /> work. <br /> On a motion by Mr.Bitsko and seconded by Ms.Dohan the Commission voted 4-0 in favor to <br /> close the hearing. <br /> Bpm <br /> DEP File No.201-1109,Bylaw No.BE 1067 <br /> NOI,4 Hancock Ave. <br /> Owner/applicant:Zoltan Juhasz,Barlex One LLC <br /> Project:Addition to single family home within the 100-foot buffer zone of bordering <br /> vegetated wetlands <br /> Need to list applicable documents f om the record for reference(ie. the RDA filing, any plans, <br /> any engineering review, any letters, drainage calcs, etc.) <br /> Presenter:Juhasz Zoltan,Professional Civil Engineer <br /> Mr.Zoltan presented the project and provided an updated plan based on the observations from <br /> the weekend site visit with the Conservation Commission.The wetland onsite was delineated <br /> by LEC under the adjacent Hancock Street administrative review for work beyond the 100- <br /> foot buffer zone.Mr.Zoltan proposes to remove the paved driveway,garage and porch and <br /> replace the driveway with previous pavers.A 120 sq.ft.porch,a 900 sq.ft.addition and <br /> attached garage will be added to the back.A portion of the garage falls within the 100ft. <br /> buffer.No activities will take place closer than 70'ft.from the wetlands boundary on abutting <br /> lot.No structures will be closer than 84'from the wetlands.In order to mitigate runoff there <br /> will be an installation of an underground retention facility.Mr.Zoltan recalled Mr.Bitsko's <br /> concern about the perviousness of the driveway.Mr.Bitsko suggested that the driveway be <br /> modeled as an impervious surface to make sure that runoff will be contained over time with <br /> the proposed recharge system.Mr.Zoltan confirmed that the proposed recharge system will <br /> provide better drainage than is provided with the existing system. <br /> Mr.Zoltan entered the revised drainage calculations in response to Mr.Bitsko's request into <br /> the record. <br />
The URL can be used to link to this page
Your browser does not support the video tag.