Laserfiche WebLink
Mr.Man reviewed several comments that were made at the prior meeting.Mr.Man reported <br /> changes to the stormwater calculations to comply with the stormwater regulations.They will <br /> use a larger system to collect stormwater flow. <br /> Mr.Hamilton entered the comments by the Engineering Department into the record. <br /> Mr.Man continued to explain that 4 FENO bounds will be installed per the Commissions <br /> comments.Mr.Man provided detail of the improved connection from downspout to the <br /> retention system. <br /> Mr.Bitsko exclaimed that the detail of overflow is different than usual,but will however, <br /> work. <br /> On a motion by Mr.Bitsko and seconded by Ms.Dohan the Commission voted 4-0 in favor to <br /> close the hearing. <br /> Bpm <br /> DEP File No.201-1109,Bylaw No.BE 1067 <br /> NOI,4 Hancock Ave. <br /> Owner/applicant:Zoltan Juhasz,Barlex One LLC <br /> Project:Addition to single family home within the 100-foot buffer zone of bordering <br /> vegetated wetlands <br /> Need to list applicable documents f om the record for reference(ie. the RDA filing, any plans, <br /> any engineering review, any letters, drainage calcs, etc.) <br /> Presenter:Juhasz Zoltan,Professional Civil Engineer <br /> Mr.Zoltan presented the project and provided an updated plan based on the observations from <br /> the weekend site visit with the Conservation Commission.The wetland onsite was delineated <br /> by LEC under the adjacent Hancock Street administrative review for work beyond the 100- <br /> foot buffer zone.Mr.Zoltan proposes to remove the paved driveway,garage and porch and <br /> replace the driveway with previous pavers.A 120 sq.ft.porch,a 900 sq.ft.addition and <br /> attached garage will be added to the back.A portion of the garage falls within the 100ft. <br /> buffer.No activities will take place closer than 70'ft.from the wetlands boundary on abutting <br /> lot.No structures will be closer than 84'from the wetlands.In order to mitigate runoff there <br /> will be an installation of an underground retention facility.Mr.Zoltan recalled Mr.Bitsko's <br /> concern about the perviousness of the driveway.Mr.Bitsko suggested that the driveway be <br /> modeled as an impervious surface to make sure that runoff will be contained over time with <br /> the proposed recharge system.Mr.Zoltan confirmed that the proposed recharge system will <br /> provide better drainage than is provided with the existing system. <br /> Mr.Zoltan entered the revised drainage calculations in response to Mr.Bitsko's request into <br /> the record. <br />