Laserfiche WebLink
Mr.Hamilton entered the engineering report into the record. <br /> Mr.Bitsko asked if the O&M plan for the subsurface recharge system complies with the <br /> Commission's standard conditions.Ms.Mullins confirmed that they do comply. <br /> Mr.Bitsko additionally asked if there will be a filter fabric on the bottom of the recharge <br /> system.Mr.Bitsko clarified that the Commission asks for the filter fabric to be solely on the <br /> top and sides of the recharge system,not on the bottom.Mr.Zoltan quickly agreed to comply <br /> with that request to remove the bottom layer of filter fabric from the design details. <br /> Mr.Wolk asked to clarify the amount of cultech units,suggesting to add more.Mr.Zoltan <br /> stated that yes,2 additional Cultech units were added as recommended by Engineering.Mr. <br /> Wolk asked again if increasing the total 10 Caltech units would be potentially beneficial for <br /> future homeowners to alert them if the system is failing.Mr.Zoltan clarified that increasing <br /> Cultec units would not be additionally beneficial. <br /> Mr.Wolk raised his concern regarding pervious paver systems and the upkeep that <br /> homeowners must endure to confirm that these systems work.Mr.Zoltan continued to <br /> confirm that perhaps when a system reached a certain age that homeowners may be required <br /> to test their systems.Mr.Zoltan pointed out that nothing is foolproof. <br /> Mr.Bitsko added that for porous asphalt there is a test for porosity that you can do upon <br /> installation and again at any interval.Any test required by order or bylaw would need to be <br /> consistent.At the DPW the porous asphalt system was designed with a fail-system(designed <br /> to fail by using bio-retention basins as back up controls)but with most residential projects <br /> there is no room to fail. <br /> Ms.Mullins brought to the Commissioners attention that the design calls for a down-gradient <br /> overflow outlet that would trickle out onto abutting property at a down gradient projection. <br /> Standard conditions require overflow at each downspout.This conflicts with the existing <br /> standard condition of the Commission.Mr.Zoltan stated he can meet this requirement via <br /> removal of the overflow outlet as designed and install overflows at each downspout. <br /> On a motion by Mr.Wolk and seconded by Ms.Dohan,the Commission voted in favor 4-0 to <br /> close the hearing. <br /> On a motion made by Mr.Wolk and seconded by Ms.Dohan,the Commission voted to <br /> adjourn the meeting at 8:55 pm. <br /> Respectfully Submitted by <br /> Katie Luczai,Department Assistant based on notes from Jordan McCarron,Stewardship <br /> Coordinator and LexMedia On Demand Video <br />