Laserfiche WebLink
-2- <br />The Board took under consideration next the <br />SUN VALLEY <br />' April 1, 1957 request of DeVries Construction Co. to <br />its for the to be <br />SEC. 15 <br />change performance guarantee work <br />done in the Sun Valley Section 15 subdivision from a <br />conditional approval contract to a bond secured by a <br />deposit. Accompanying said request was a letter of <br />the same date from the Superintendent of Public Works <br />stating that the required work to be done in said sub- <br />division was 80% complete. Considering the fact there <br />was so little work to be done in said subdivision the <br />Board decided not to grant the Company's request at <br />this time and asked Mr. Snow to discuss the matter fur- <br />ther with Mr. George DeVries. <br />Read to the Board was Stephen Hopkins' April 1, <br />ASSOCIATES <br />1957 letter stating that he had not received the <br />REALTY <br />Board's amended letter of instructions in regard to <br />TRUST <br />changes required by the Board in the design of the <br />hotel proposed to be erected on the land of the Asso- <br />ciates Realty Trust at the corner of Routes 128 and <br />2 A in Lexington. Read to the Board was a draft of <br />a letter dated April 2, 1957 replying to the Hopkins' <br />letter and statingg that there evidently had been some <br />misunderstanding in regard to his expected receipt of <br />a letter concerning changes in the hotel plans. The <br />letter stated that the Board had approved certain <br />' <br />changes ,at its meeting on March 26, 1957, and that Mr. <br />at <br />Snow in conversations had communicated the <br />Board's decision, both to Mr. Hopkins and Mr. Priestly, <br />the architect, and had requested that a conference be <br />arranged to discuss the exterior design of the hotel <br />dining room but that to date the Associates had not <br />arranged for the requested conference. The Board <br />approved the draft of said letter which was signed by <br />the Chairman. <br />The Board discussed the plans for the Robinson <br />ROBINSON <br />Hill Section 3 subdivision and decided that it would <br />HILL <br />approve the subdivision subject to the conditions <br />SECTION 3 <br />that a curb be built along the southeasterly side <br />line of the development of Childs Road from the <br />northerly corner of Lot 17A in an easterly direction <br />for a distance of approximately 60 feet, that an <br />opening in the curb be allowed for a driveway ten <br />feet wide, that the grade of the driveway be raised <br />by means of a short ramp approximately 6 above the <br />grade of the edge of the road, and that a driveway <br />of said width be located southeasterly across Lot 5 <br />to the adjacent land of Leeland Construction Co. <br />Mr. Snow was requested to prepare in rough draft a <br />plan of said curb and driveway to be drawn upon the <br />subdivision plan. It was decided to withhold final <br />