Laserfiche WebLink
RECEIVED <br /> 2022 21 Mair, 132 Il iu s <br /> Greenways Corridor Committee <br /> Final Minutes I OWN CLERK <br /> 3 February 2022 <br /> 4:30 to 6:00 pm via Zoom Conference LEXINGTON MA <br /> Members Present: Mal Crawford, Alex Dohan, Peggy Enders, Eileen Entin, Bob <br /> Hausslein, Bobak Moshiri, Keith Ohmart (chair), Stephen Perkins, Mike <br /> Tabaczynski <br /> Members Absent: None <br /> Other Attendees: Susan Kenyon <br /> Meeting Minutes of Dec 2, 2021 approved unanimously. <br /> Reports/Updates <br /> Route N route tweak. Keith reported that the signage for the entrance into <br /> Willards Woods has been moved from the end of Red Coat Lane to between <br /> houses number 5 and 9. <br /> Route 13/Manor route update. Keith reported that the Cider Mill Lane <br /> homeowner's association has approved locating a post and signage at the right <br /> of way. Post to be installed in the spring. Keith has talked with DPW and secured <br /> permission to trim the shrubs along the "paper street" between the end of Blake <br /> Rd and Williams Rd. Discussion of whether to label the route "O" or "P" ensued. <br /> Most favor "P" but agreed to "sleep on it." Keith will order new stickers for letters <br /> beyond "O". Peggy suggested keeping in mind the ramp from Essex St down to <br /> the bikeway in the future with an eye to connecting that neighborhood. <br /> Jefferson Drive trail connector update. The connector is now in place. Keith <br /> reported that Mike will handle getting permission from the Burlington <br /> Conservation Commission for placing ACROSS signage in the Landlocked <br /> Forest. It was also suggested that we pursue getting signage on Jefferson Drive <br /> which points to the trail linking up with Wright Farm. <br /> Route "4" Discussion. With the connection in place, consideration now shifts to <br /> the rest of the route and how to label the connection across 95/128 between this <br /> new route and route N. Mike suggested that the best way to skirt Wright Farm in <br /> the near term is to cross Grove St at the eastern edge of the farm and follow <br /> Grove St west to Carriage Drive. We will also need to do some field assessment <br /> of how wet the trail under the power line gets. It will be important to resolve any <br /> trail adjustment in the coming months to ensure that it is correctly included in the <br /> new brochure. <br />