Laserfiche WebLink
Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Holly Samuels —Aye <br /> David Langseth—Aye <br /> 19:00 (LexMedia Recording) <br /> 15 Volunteer Way- Ashok Patel, update on expansion of work limit and changes to the site <br /> within the 100-foot buffer zone <br /> Mr. Richard Kirby, LEC Environmental, Mr. Tim Power, PVI Site Design, Mr. Ashok Patel and <br /> Mr. Kamlesh Patel, presented to the Commission. Plans were provided that show proposed <br /> changes to Feno marker locations. The Lexington Engineering Department is requesting soils <br /> data and drawdown time calculations to show the system drains within 72 hours. This will be <br /> continued so the representatives can respond to the Engineering comments. <br /> 47:45 (LexMedia Recording) <br /> 14 Village Circle: update on enforcement order, violation of patio work without Conservation <br /> approval <br /> Mr. Mark Arnold, Goddard Consulting, presented before the Commission. An 18-inch recharge <br /> trench around the patio was added to the plan to capture stormwater. The buffer strip was <br /> reduced from 4 feet to 3 feet and additional Feno markers added as requested by the <br /> Commission. A special condition will be added to include a geotextile filter fabric to the outer <br /> vertical wall of the recharge trench. <br /> On a motion by Mr. Beuttell and seconded by Ms. Samuels, the Commission voted 5-0 by roll <br /> call vote to approve the restoration plan through an enforcement order. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Ruth Ladd—Aye <br /> Holly Samuels —Aye <br /> David Langseth—Aye <br /> 55:40 (LexMedia Recording) <br /> New Public Meetings/Hearings <br /> Amendment to Order of Conditions —6 Blinn Road <br />