Laserfiche WebLink
total cost, and they want to spend 40% of that to get to design <br />development, they are in the ballpark of a $400K - $500K request at <br />ATM with a debt exclusion in FY08 (CY 2007). <br /> <br />Adult Day Care on Mill St, Lincoln is popular and is growing. 1700 <br />s.f. currently. Muzzey (current Senior Center facility) is about <br />8K-10K s.f. <br /> <br />GB implores COA to also be carefully about operating costs. <br /> <br />Marian C: 3 possible sites are still in play: Harrington, Munroe <br />(existing building), and Muzzey (using the field next to it). <br /> <br />Roger B: Asks if they'll also look for grant money [they will]. <br /> <br />CPA Presentation: <br /> <br />R. Canale, Bob Bicknell, Marily Fenallosa (Historical Commission), <br />Betsey Weiss. <br /> <br />Betsey Weiss made CPA's 30 minute presentation. <br /> <br />We should expect some ATM warrant articles in the spring. They won't <br />have any matching funds, but they will have some CPA collections in <br />FY07 if CPA passes so they will want the option to spend some of it. <br /> <br />Agree to post for 6:30 on Nov 7 and 9 at the STM. <br /> <br />Adjourn at 5:30. <br />