|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2005-10-11-CEC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Capital Expenditures Committee-CEC
>
Minutes
>
2000-2009
>
2005
>
2005-10-11-CEC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 12:34:42 PM
Creation date
3/5/2009 1:06:50 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
CEC - Capital Expenditures Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CEC 10/11/05, 4pm, Rm 111 TOB <br /> <br />Lamb, Stolz, Edson, Burnell, Hurley, Borghesani, Kanter <br /> <br />Motion to approve minutes from 9-14-05 minute passed. <br /> <br />Burnell has submitted resignation effective conclusion of November <br />Special Town Meeting. Roger Borghesani will be attending departmental <br />presentations and become CEC immediately following GB's resignation. <br /> <br />COA Presentation: <br /> <br />Paul Lapointe and Marian Cohen <br /> <br />BoS has established a Senior Center Review Committee to review program <br />and space needs. Preliminary report to BoS in January with final <br />report to follow in March. Original $50K appropriation from FY03 is <br />what they've been using. They were permitted to spend $30K of it <br />prior to finding a suitable site. They have spent $15K of that (so <br />they still have $35K). The appropriation was for site planning, <br />program and space needs. They urged CEC to look at current condition <br />of the building and also the program needs of the seniors. The <br />current deed says they can't do anything in the building in the late <br />afternoon, early morning, or weekends. Relationship with the condo <br />association has improved. They are conducting programs in "transit" <br />space which is not layed out well. Sewage backup is the current <br />problem and has happened 3 to 4 times in the past 15 mos. This is a <br />health problem and shuts down programs. GB points out that this is an <br />operating issue and not a capital issue. The town does the maint. on <br />the facility. COA needs to determine whether the problem is a Condo <br />Assoc. or a Town problem. The senior center is essentially a condo in the <br />building. <br /> <br />The $15K that they've spent was on a town-wide survey evaluating <br />programs needs, providers, and participants. BoS SC Committee would <br />continue to evaluate the program requirements, sites, recommend one <br />site, and arrive at a first pass of a budget. The final result will <br />be "This is the program, this is the site, and this is the $'s <br />needed." CEC asked what would happen to the rest of the open article <br />from FY03 (the $35K) since COA doesn't expect to spend any more of it. <br />Paul L. said didn't know, either it would be closed out or used as <br />part of the D&E money for the new center. PL wants to get to design <br />development using an FY07 appropriation at the ATM -- this would be <br />30-40% of the soft money. PL says the estimates for the new center <br />are as high as 30K s.f. (that would include Adult Day Care) and at <br />$225 to $250/s.f. that would be ~ $7.5M. If design is 10-12% of the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.