Laserfiche WebLink
PBC Meeting Minutes <br />2 -22 -12 <br />4.0 Bridge &Bowman Renovation Projects <br />4.12 Project schedule <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />10/13/11 <br />Construction Documents are scheduled for completion on 11/3/11. <br />Lexington will need up to date copies for MEP document review. <br />Contractor prequalification deadlines need to be scheduled into project. <br />11/2/11 <br />Final Documents due 1113 <br />Drawings to go to MEP review <br />Variance request to be sent to Plumbing Board for unisex toilet in kitchen <br />Pre - Qualification of Contractors due 11122 <br />12/8/11 <br />The Plumbing Board Variances were mailed out. <br />Contractor pre - qualification was discussed at a mtg. on 1217111 and a list of pre - qualified firms has been established. <br />Plans and specs are released to bid on 113112. <br />1/19/12 <br />Filed Sub bids are due 1/31/12 <br />Addenda issued by DDP 1/19/12 <br />GC Bids 2/14/12 <br />4.26 Roof Top Unit screening <br />11/2/11 <br />It was reported that the roof top hvac equipment would be larger than originally anticipated and could be 18 inches to 2 feet taller. <br />There was some concern expressed over the aesthetics of the larger units and the overall view of the school to the public, <br />notwithstanding any sound abatement concerns. Various options for screening and placement of support structure for future <br />screening were discussed. Currently six units suspected of a need for screening based on sound abatement were modified to include <br />roof reinforcing for future screen panels. It was discussed to increase this count to 10 to include units where screens maybe desired <br />for aesthetics as well; however this motion was not acted upon, leaving just the original 6 locations <br />12/8/11 <br />This issue was again discussed and the PBC elected to request a unit price be added to the bid submission for adding the steel <br />support to other RTU locations if the town elected to do so during construction. <br />1/19/12 <br />Initial feedback from architect was that they did not want to include a unit price for additional RTU locations, but they later <br />agreed to do so. <br />4.28 MEP Review <br />12/1/11 <br />Brief discussions over C3 review of MEP documents comments have been sent to Architects and Engineers and engineers have <br />responded. C3 satisfied with return comments. <br />12/8/11 <br />PBC Requested that DPF ask C3 to verify if suggested changes have been made. <br />1/19/12 <br />DPF did request C3 to verify changes made, which was done and C3 and DPF are following up on last items. <br />Page 3 of 9 <br />