|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-02-09-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2012
>
2012-02-09-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:11 PM
Creation date
4/9/2012 9:18:00 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />2 -9 -12 <br />2.83 Front Walkway <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />10/13/11 <br />DPF working with DPW for new walkway construction as designed by HKT, with hopes of getting work complete before winter. <br />1/19/12 <br />Complete <br />2.84 Close -Out <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />5/12/11 <br />PBC frustrated that project has not been "closed- out ". DPF shared that frustration and while we have been following some <br />warranty items, plantings, etc. close out has been awaiting the completion of the fluid distribution system and the site as- built. DPF <br />is hopeful that these items are nearly complete and we will be able to "close -out" project. <br />9/8/11 <br />Landscape Architects met on site with owner to review closing order of conditions and are now waiting for small updates to site as- <br />built for completion. <br />12/1/11 <br />Final close -out and payment is forthcoming <br />1/26/12 <br />Final payment to CTA construction included in monthly bills. <br />4.0 Bridge &Bowman Renovation Projects <br />4.12 Proiect schedule <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />10/13/11 <br />Construction Documents are scheduled for completion on 11/3/11. <br />Lexington will need up to date copies for MEP document review. <br />Contractor prequalification deadlines need to be scheduled into project. <br />11/2/11 <br />Final Documents due 1113 <br />Drawings to go to MEP review <br />Variance request to be sent to Plumbing Board for unisex toilet in kitchen <br />Pre - Qualification of Contractors due 11122 <br />12/8/11 <br />The Plumbing Board Variances were mailed out. <br />Contractor pre - qualification was discussed at a mtg. on 1217111 and a list of pre - qualified firms has been established. <br />Plans and specs are released to bid on 113112. <br />1/19/12 <br />Filed Sub bids are due 1/31/12 <br />Addenda issued by DDP 1/19/12 <br />GC Bids 2/14/12 <br />4.26 Roof Top Unit screening <br />11/2/11 <br />It was reported that the roof top hvac equipment would be larger than originally anticipated and could be 18 inches to 2 feet taller. <br />There was some concern expressed over the aesthetics of the larger units and the overall view of the school to the public, <br />notwithstanding any sound abatement concerns. Various options for screening and placement of support structure for future <br />screening was discussed. Currently six units suspected of a need for screening based on sound abatement were modified to include <br />roof reinforcing for future screen panels. It was discussed to increase this count to 10 to include units where screens maybe desired <br />for aesthetics as well, however this motion was not acted upon, leaving just the original 6 locations <br />12/8/11 <br />Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.