Laserfiche WebLink
PBC Meeting Minutes <br />12 -15 -11 <br />7.15 Conservation <br />12/1/11 <br />A proposal was reviewed to have GLM engineering prepare and submit an Abbreviated Notice of Resource Area Delineation to <br />formalize the discussions with conservation on the impacts to the project. <br />Motion to approve additional services to GLM Engineering in the amount of $1200 for "Abbreviated Notice of Resource Area <br />Delineation" for Estabrook project. <br />Motion: Peter Johnson 2nd: Dick Perry Vote: Unanimous <br />7.16 LEED <br />12/1/11 <br />Brief discussion on LEED design. DDP expressed that MSBA reimburses 2% for LEED Silver certification the first pass thru the <br />LEED scorecard should occur in the schematic design phase. <br />7.17 School Committee <br />12/1/11 <br />The school Committee is meeting on 12/6/11 with a scheduled presentation by DDP and the school committee is seeking a <br />representative to be there from the PBC. <br />7.18 Mosaic <br />12/1/11 <br />There has been discussion about saving the Estabrook logo mosaic, so the construction of the mosaic is being tested for <br />contaminants during December break. <br />7.19 Traffic Clarification <br />12/8/11 <br />PBC discussed the need for clarification as to the extent of involvement of the ETF committee with traffic concerns on the <br />Estabrook site. Peter Johnson will communicate a reminder to the ETF that the PBC has responsibility for oversight of traffic <br />concerns within the Estabrook site and that while they will seek a recommendation from the ETF on the amount of queuing that <br />may be required based upon their work leading to the property line, it is the PBC who should coordinate the actual design and <br />layout of this work on site with the architect and traffic consultant. <br />7.19 Contract bride <br />12/8/11 <br />DPF advised that a strategy will need to be developed to use remaining available funds from current authorization to bridge gap <br />of professional services at the conclusion of the study phase of the project to allow continued development of the project or <br />subsequent phases until town meeting authorizes additional funding. <br />Meeting Adjourned <br />Motion to Adjourn 12/15/11 9:15 PM <br />Motion: Eric Brown 2 Dick Perry Unanimous <br />Page 8 of 8 <br />