PBC Meeting Minutes <br />12 -15 -11 <br />7.12 Study Options Renovation versus New Construction <br />11/17/11 <br />DDP presented a power point on study progress which outlined space needs program and site development options looking at <br />access, renovation and addition or new construction, be it 2 story or 3 story. <br />PBC will be asked to vote at their next meeting to support either a renovation and addition option or a new construction option. <br />12/1/11 <br />DDP presented a power point outlining the work to date and beginning the conversations on the many elements of the project that <br />need to be considered during design, such as design features, aesthetics, building entry, library, classroom organization, lockers, <br />playground, cafeteria, gymnasium, etc. <br />The program was again confirmed in the 89- 90,000 sf range. <br />The committee discussed the letter received from DDP regarding the preferred schematic study and recommendations to the MSBA. <br />Motion to accept letter from 01 December 2011 from DDP to LSBC to approve of the development of options 2, 3 and 4 to provide <br />for a new Estabrook Elementary School on the vacant portion of the site for the reasons outlined in said letter. <br />Motion: Dick Perry 2" d : Joe McWeeney Vote: Unanimous <br />7.13 2 Story versus 3 story Design Option <br />11/17/11 <br />DDP felt that Discussion on 2 story vs. 3 story should first focus on responding to the educational needs and then look at other <br />impacts. PBC wants to be part of these discussions in considering construction and operating cost differences. DDP stated that <br />there is a 1 -3% reduction in operating and construction costs when going from 2 story to 3 story. <br />12/8/11 <br />PBC needs to vote on the preference for 2 story versus 3 story at next meeting. DDP will prepare a presentation. <br />12/15/11 <br />Dinisco Design Partnership conducted an update /review of the various design options, 2 story and 3 story and lead a discussion <br />on the benefits and advantages of the various options on overall building layout, response to educational requirements, <br />program requirements, impact on site use and development and costs, see also DDP memo of 15 December 2011. <br />There was discussion regarding the possible need for variances due to height restrictions in the zoning bylaws (36') when <br />considering multi story building design (as much as 42' w/ 3 story). 3 story option has shorter construction time than some of <br />the 2 story options. <br />An assessment was presented that demonstrates the path of travel for students and staff from two common points in each of <br />the design options, the 3 story option had the shortest travel path. <br />Motion: The PBC recommends option 3C to the School Committee as the most desirable option; This option provides an interior <br />layout that effectively meets the Estabrook educational program requirements; Has the smallest building footprint of any of the <br />options considered; Has delivery / service area situated in a preferred location for student safety; maximizes recreational and <br />educational outdoor space for student use; improves vehicle and pedestrian traffic circulation; and provides adequate parking. <br />PBC understands the project costs prepared by RF Walsh are between $38.9 and $42.7 million dollars for bid in January 2013. <br />Motion: Eric Brown 2" d : Charles Favazzo Unanimous <br />7.14 Schematic Design <br />11/17/11 <br />PBC requested that some discussion take place with DDP and PBC over design styles and aesthetics as the architects should be <br />aware of what general direction the PBC feels the design should be so as not to waste valuable and limited time in design phase. <br />DDP stated that SD deliverables would include: <br />Cost Estimates, Narrative on Systems, Narrative on Site, Narrative on finishes, Plans, Elevations, sections, Rendering and permitting <br />issues <br />12/1/11 <br />DDP expressed that the design phase would be beginning and there was general discussion on the design, historical elements <br />and their impact on design in Lexington and other design features. PBC suggested that the architects not cast the design <br />features too quickly until they make some suggestions to the PBC to confirm an appropriate direction. <br />12/15/12 <br />PBC wants to be sure that DDP meets with PBC at least three times in January to have an opportunity to review and comment on <br />design decisions. <br />PBC would like to see 3d modeling of school with topography and perhaps a view from Grove Street. <br />Page 7 of 8 <br />