Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-11-02-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2011
>
2011-11-02-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:23 PM
Creation date
1/6/2012 11:01:46 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />02 November 2011 Meeting <br />AFurniturebudgetneedstobeaddedtoindirectcoststoaccountfornewclassroomfurnitureintheaddedclassroomsandthe <br />renovatedlibrarycheckoutdesks. <br /> <br /> <br /> <br /> <br />DiscussiononsecondshiftconstructioninCentralcoreareas,preferredoverregulardayshift.Itwassuggestedthatallafternoon <br />programmingatbothschoolsshouldberelocatedtootherbuildingsduringtheconstructionphases. <br />Keydateswithinthesummerconstructionsequencesshouldbeidentifiedandincludedinthespecssopthattherearemidsummer <br />milestonestohelpkeeptheprojectontrack. <br />PBCstillhasconcernforthephasingandtheschedule. <br />9/8/11 <br />Questionwasaskediftherewasanythoughtofputtingtheadministrativeareaintotrailers?AnsweristheAdministrativestaff <br />mustbeinthebuilding. <br />UpdatedPhasingplanswerereviewed,howevertherewasadisconnectbetweenthearchitectsandtheprincipalsinthelogisticsof <br />swingspaceforstaffwithinthebuildingtofreeupadministrativeorcentralcorridorspacesforrenovation.Thisissuetobe <br />reviewedfurther,however,theoverallthemewastoallowforconstructionofportionsofthecentralcorridorspacesafterthe <br />summerbreakbutduringoffhoursorsecondshiftonly. <br />PBCaskediflayingouttheswingspacewasincludedthearchitectsworkandtheyconfirmed. <br />10/13/11 <br />Jon,PeterandCarlattendedaphasingreviewmeeting.Abulletedlistofdiscussionpointswasdevelopedanddistributed. <br />Someoftheareasofconcernandprimarydiscussionpointsfocusedaroundstatusoftheelectricalplans,locationofverizonduct <br />bank,abatementworkintunnels.DPCwastosendupdatedelectricalplansforadditionalreview. <br />4.11WindowPatternsandOperation <br />5/12/11 <br />DPCpresentedthreewindowdesignsA,BandC.ArchitectsliketypeC.Discussionfollowed.Bhasmostoperableunits,Atheleast, <br />Teachersandstaffwillwantmostoperableunits,whynotDoubleHung,DPChassafetyconcernondoublehung,questiononcosts <br />changesforoperableunits. <br />Architectstoreportbackatnextmeetingoncostsofoperableunits. <br />6/9/11 <br />Discussiononhungwindowsversusprojectingwindows.DPFtoforwardinfoonhungwindowsinFiskeandorHarrington.PBC <br />requestscostoptionsondoublehungwindows. <br />9/8/11 <br />DPChasdesignfordoublehungcostinbudget+/$800,000.PBCverifiedthatschoolcommitteewasawarethat$10,000 <br />energybenefitonwindowreplacementhadaboutan80yearpayback. <br />10/13/11 <br />Windowsinbasescopeasestimatesits,howeverPBCcanhavethewindowsbecomeanaddalternate. <br />4.12Projectschedule <br />5/12/11 <br />Projectschedulewasbrieflydiscussed;howeverfinaldecisionsonbidperiod,townelections,andTownMeetingmayrelyon <br />outcomeofTownBudgetSummitmeetingtobeheldinJune. <br />9/8/11 <br />ScheduleforCDcompletiontoearlyNovember. <br />10/13/11 <br />ConstructionDocumentsarescheduledforcompletionon11/3/11. <br />LexingtonwillneeduptodatecopiesforMEPdocumentreview. <br />Contractorprequalificationdeadlinesneedtobescheduledintoproject. <br />11/3/11 <br />FinalDocumentsdue11/3 <br />DrawingstogotoMEPreview <br />VariancerequesttobesenttoPlumbingBoardforunisextoiletinkitchen <br />PreQualificationofContractorsdue11/22 <br />Page 5 of 10 <br /> <br />