|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-07-21-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2011
>
2011-07-21-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:23 PM
Creation date
1/6/2012 10:47:57 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />21 July 2011 Meeting <br />4.22FireSeparationatModularClassrooms <br />7/14/11 <br />OptionsforFireseparationforthemodularclassroomswerediscussedandwithprojectedcostsor$25,000 <br />(wall)and$48,000(modularrelocation)ThePBCdiscussedsupportforthelessercostoption(wall)aslongas <br />optionisapprovedbybuildingcommissioner. <br />7.0EstabrookElementary <br />7.1EstabrookSOI <br />2/10/11 <br />MSBAsupportedEstabrookSOI.Reimbursementwouldbebetween31and40%.MSBAhasprocedurestofollowforOPM,Designer <br />andSchematics.IssuegoingtoTownMeetingforfundingrequest. <br />4/14/11 <br />OPMandDesignerSelectiontobeginsoon. <br />5/12/11 <br />DPFfoundoutthatprojectwasnotacceptedbyMSBAasemergencyprojectbutasnormalproject. <br />6/9/11 <br />MSBAhassaidtheywillsupport540studentplanforEstabrook <br />7.2OPMSelection <br />5/12/11 <br />DPFprovidedanupdateontheOPM&DesignerselectionProcess.Itwassuggestedthatthecommitteedivideintotwogroupswith <br />threemembersinvolvedinselectionofthedesignerandthreeinvolvedinselectionoftheOPM. <br />DesignerSelectionMembersOPMSelectionMembers <br />CarlOldenburgJonHimmel <br />ChuckFavazzoEricBrown <br />PeterJohnsonDickPerry <br />DateswerediscussedforOPMproposalandselectionprocess <br />23JunereceiveproposalsDPFwilldistribute <br />27Junemeettodiscussrankings.7:30AM <br />30Juneinterviewsstartingat6PM. <br />11JulymeetingwithMSBA <br />6/9/11 <br />Schedule(above)reviewed.RFShasbeenissuedand12requestshavebeenmadetodate. <br />7/14/11 <br />RepresentativesofRFWalshwereintroducedastheselectedOPMFirm. <br />RFWalshmadeashortpresentationonprojectschedule. <br />duleneeds. <br />Sept.isgoingtobesobusyitneedstobeplannedoutverycarefullytoachievesche <br />7.3DesignerSelection <br />6/9/11 <br />DesignerSelectionhasnotbegunyet.Towngetsthreevotesoutoffifteentotalinselectingthedesigner <br />PBCmembersrequestedseeingtheRFSforDesignerServices <br />7/14/11 <br />DiscussionondraftofRFSforDesignerServices. <br />ThreemembersconfirmedforDesignerSelection,ChuckFavazzo,CarlOldenburg,PeterJohnson. <br />0willneedfeedbackprior. <br />RFSavailable7/2 <br />Page 8 of 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.