Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-07-21-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2011
>
2011-07-21-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:23 PM
Creation date
1/6/2012 10:47:57 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />21 July 2011 Meeting <br />4.19BridgeGymFloor <br />7/14/11 <br />Oldmasticbelowexistinggymflooratbridgewouldrequireaddedprojectscopetoabate.Discussedcostoptions <br />needforreplacement.ReplacementoftheBridgegymnasiumfloorsolelyforthepurposesofabatementofmastic <br />wasdiscussed.Thegymfloorisotherwiseinacceptableconditionsandfullyintact.Replacementofthefloor <br />solelyforthepurposesofabatementofotherwiseintactmaterialwasnotpreferred. <br />4.20Entrance <br />6/9/11 <br />Currentscopehasnoplansformodificationsatthebuildingentrancediscussiononremovingexistingentrancecanopy <br />andaddingnewcanopywithnewwalksandlandscapingtoimproveschoolentrance.Itwasproposedthatthis <br />elementoftheworkcouldgoalongwayinsolicitingsupportfortheproject. <br />4.21ReviewofDesignDevelopmentEstimate <br />7/14/11 <br />DPCreportsprojectdesigndevelopmentestimateis$2,834,515overestimatedSchematicDesignprojections. <br />DPCattributedsomeofthesecostincreasesto: <br />materialprices,ductwork,pipeandwiregoingup. <br />Generalconditionsoriginallyasapercentage.Needfordoubleshiftsinthesummer. <br />Complexitieswerenotanticipated. <br />Discussionensuedonwaystobestpresentandunderstandthecurrentcostestimatesanddeterminewhereoverruns <br />mightbe.ItwasagreedthatanadditionalmeetingwouldberequiredwithfurtherrefinementoftheestimatebyDPC. <br />7/21/11 <br />DPCpresentedsummaryofprojectcostandreviewed <br />Manywouldliketomoveforwardwiththeprojectbutitisimportanttounderstandwhythenumberswentup. <br />Alsoitneedstobedeterminedhowreliablethecurrentnumberswillprovetobe. <br />DPCisconfidentthatthescopeisfullycaptured,butspeculatesthatthemarketcostwillcontinuetorise. <br />Alsoitwaspointedoutthattherearenofiguresinbudgetfornightlycleaningduringconstruction;andthisshould <br />beaddedin. <br />Otherdiscussionsincludedwhatcanberemovedfromtheaddedscopetogetclosertotheoriginalbudgetnumber? <br />Whatisthepaybackonthenewwindows? <br />PBCwouldlikeDPCtoputtogetheralistofalternatestogetbacktothe19.3number. <br />DiscussiononOptionalSeismicbracingforBridge,thoughtswerethatifitisnotrequiredatthistimeandcanbe <br />donewhenroofisreplacedinthefuturethenpossiblywaituntilthentodoso,howeveritwouldbehelpfulto <br />knowwhatkindofseismiceventwouldcausefailure. <br />Discussiononnewentrancecanopiesincludedfavorablecommentsonaverynicedesign.Somefeltthatifthe <br />projectcanaffordthemitwouldbeapossibleadd,howevercurrentchangesinoverallprojectcostsneedtobe <br />understoodfirst. <br />Summaryofdiscussions: <br />DPCtokeepmovingforward. <br />Aclearerexplanationofincreasedcostisneededpriortonextmeetingscheduledfor8/11/11. <br />If/Howcanwegetbackto19.3million? <br />ListofDesignScope/Deducts <br />Addalternates <br />Page 7 of 9 <br /> <br />