PBC Meeting Minutes <br />10 February 2011 Meeting <br />PBC discussed HKT pursuing painter to get them to do as much as possible, but do it right. <br />Motion to set aside monies to hire a specialist to review conditions and processes of the wash bay area, may include forensics. <br />Motion: Dick Perry 2nd: Eric Brown Vote: 5 -0 <br />6/08/10 <br />Simpson Gumpertz & Heger Proposal was reviewed by PBC. PBC members would like the scope and tasks for investigation needs to <br />be defined. Mark Barrett to coordinate a meeting to discuss with Greg from SG &H. <br />7/13/10 <br />Meeting was held on 6118110 to review SGH Scope on report for vehicle wash Bay. <br />Draft report due on 7/26/10 for PBC review and proposed review mtg on 7128110 with Town Manager. <br />9/14/10 <br />When estimate is received DPF will send out to PBC members to review. <br />10/12/10 <br />It was discussed that in future contracts System Design Statements along with training requirements need to include design <br />intent. <br />2.83 Front Walkway <br />9/14/10 <br />DPF reported that DPW had a cost range of $13- 15,000 to install a sidewalk following the incoming driveway, instead of passing by <br />the flagpole at the center. PBC felt that the work could be done for less money and should be bid instead of using the state vendor <br />contract and that HKT had a responsibility to provide the town with design options and construction documents that could be put <br />out to bid. PBC asked DPF to notify HKT on need to meet design /code requirements and that they should provide layouts /options <br />(bike path is not a viable design option) to the PBC for review and that construction documents suitable for bid should be provided <br />10/12/10 <br />Mark Barrett will contact Gary Rhodes for a memo on code violation. <br />11/9/10 <br />Memo was sent to HKT and awaiting response. <br />12/14/10 <br />HKT provided several sketches that would satisfy the requirement to connection the public sidewalk to the front entrance. The PBC <br />elected to have Bill Hadley select a walkway plan from those presented, that he was satisfied with and get pricing to complete the <br />work. <br />4/14/11 <br />Reported no activity to date, waiting for snow to melt, DPW will be obtaining prices for work defined by HKT and will report back <br />to PBC. <br />4.0 Bridge &Bowman Renovation Projects <br />4.4 LEED Certification <br />12/14/10 <br />The Project Architects outlined that LEED certification was not considered to be viable given the scope and nature of the proposed <br />work at Bridge and Bowman and recommended against pursuing the certification. The School Principals' thought that the funding <br />for LEED pursuits could be better suited to go towards items that will effect programming or educational issues. <br />4/14/11 <br />LEED was discussed and it was agreed that work should focus on energy aspects and incorporate into the specs those items that <br />can be incorporated in the spirit of LEED. Further that the last part of the last sentence of the LEED Ltr from DPC dated 23 <br />November 2010, should be followed.... "... we suggest designing all systems within the current scope to a standard that would be <br />required for LEED Certification but not add additional scope solely for the purposes of achieving certification." And report back <br />on what measures are being done. <br />Page 4 of 6 <br />