Laserfiche WebLink
PBC Meeting Minutes <br />10 February 2011 Meeting <br />2.26 Budget <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />7/13/10 <br />No updates <br />1/13/11 <br />DPF transmitted budget status Update, Currently $184,982.00 in encumbered funds and $2,560,381 in un- <br />committed funds remaining. Advising that $250,000 may be required for the wash bay fix, $200,000 held for <br />potential AC expansions if approved, $50,000 for contingency, and $40,000 for approved EOC expenses not yet <br />transitioned to Purchase Orders. <br />2.60 Site Signage at Street <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />11/9/10 <br />Existing lights have been powered up and are too strong and create hot spots, DPF to contact light vendor for fixture <br />recommendations. <br />12/14/10 <br />DPF made contact with Reflex lighting and is waiting fixture recommendations. <br />1/13/10 <br />DPF working with DPW to develop cost effective design solution to lighting issue. <br />2.73 Fluid Distribution System <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />7/13/10 <br />Parts are on order for interfacing system with existing tank monitoring system and spill boxes, when received system will be <br />complete. <br />12/14/10 <br />Waste Oil Heater & Fluid Distribution System at 98% complete <br />2.82 Wash Bay <br />04/13/10 <br />The PBC toured the vehicle car wash area to review the current conditions of erosion, paint decay, water seepage and equipment <br />operation. See HKT email of 1 -28 -10 and HKT letters of 2 -4 -10 and 3 -25 -10 and RW Sullivan memo of 5- 12 -10. <br />After much discussion of the many issues involved the PBC requested that HKT return to the next meeting with recommendations on <br />how each item can be addressed and resolved. <br />5/11/10 <br />HKT power point presentation will be forwarded to DPF. <br />Design team has not seen this type of condition with similar systems in other DPW's. <br />Review of steel, operator and disconnect. <br />Discussion needed of sequence of operation for the car wash. <br />PBC discussed HKT pursuing painter to get them to do as much as possible, but do it right. <br />Motion to set aside monies to hire a specialist to review conditions and processes of the wash bay area, may include forensics. <br />Motion: Dick Perry 2nd: Eric Brown Vote: 5 -0 <br />6/08/10 <br />Simpson Gumpertz & Heger Proposal was reviewed by PBC. PBC members would like the scope and tasks for investigation needs to <br />be defined. Mark Barrett to coordinate a meeting to discuss with Greg from SG &H. <br />7/13/10 <br />Meeting was held on 6118110 to review SGH Scope on report for vehicle wash Bay. <br />Draft report due on 7/26/10 for PBC review and proposed review mtg on 7128110 with Town Manager. <br />9/14/10 <br />When estimate is received DPF will send out to PBC members to review. <br />Page 3 of 6 <br />