|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-01-13-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2011
>
2011-01-13-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:23 PM
Creation date
11/2/2011 11:46:32 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />13 January 2011 Meeting <br />2.4. DPW Construction Schedule <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />9/14/10 <br />Mike Lawrence reviewed punch list memo of 9113110 of remaining punch and warranty items. Nearing completion. <br />10/12/10 <br />O &M Manuals and as builts are being reviewed. 1 warranty item for plant replacement on roof top remaining. Fluid Distribution <br />System nearing completion. Waste oil heater waiting for the tie in. <br />2.26 Budget <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />7/13/10 <br />No updates <br />1/13/11 <br />DPF transmitted budget status Update, Currently $184,982.00 in encumbered funds and $2,560,381 in un- <br />committed funds remaining. Advising that $250,000 may be required for the wash bay fix, $200,000 held for <br />potential AC expansions if approved, $50,000 for contingency, and $40,000 for approved EOC expenses not yet <br />transitioned to Purchase Orders. <br />2.60 Site Signage at Street <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />11/9/10 <br />Existing lights have been powered up and are too strong and create hot spots, DPF to contact light vendor for fixture <br />recommendations. <br />12/14/10 <br />DPF made contact with Reflex lighting and is waiting fixture recommendations. <br />1/13/10 <br />DPF working with DPW to develop cost effective design solution to lighting issue. <br />2.61 Punch List <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />9/14/10 <br />HKT presented updated punch list and warranty items. <br />PBC asked if vehicle wash bay items were part of the punch list. HKT responded that they were not, as they did not arise until well <br />after the punch list was created. <br />12/14/10 <br />HKT reported punch list complete. <br />2.73 Fluid Distribution System <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />7/13/10 <br />Parts are on order for interfacing system with existing tank monitoring system and spill boxes, when received system will be <br />complete. <br />12/14/10 <br />Waste Oil Heater & Fluid Distribution System at 98% complete <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.