Laserfiche WebLink
� <br />Selectmen's Meeting January 22, 1388. <br />#5450, Road Machinery, $357,240 <br />#5500, Snow Removal, $163,200 requested.. <br />#5800, Street Lights, in the amount of 3407, -8 <br />#5700, Sewer /Water Maintenance, requesting $134,700 for sewer <br />maintenance and $113,250 for Water maintenance. <br />#5800, Curbside Collection, $832,440. <br />#5850, Sanitary Landfill, #3,850. <br />#8000, Shade Tree Division, $17;840. <br />#8400, Cemetary Division, in the amount of $20,335. <br />Mr. Marshall thanked the Public Works and Engineering Departments for <br />excellent job performances. Mr. Hutchinson noted overall marked improvement <br />in DPW\Engr. sick leave time taken and the emphasis on safety under the <br />leadership of Superintendents, which he felt wi lead to lowered insurance <br />premiums. <br />CAPITAL AND OPERATING ARTICLE REQUESTS • <br />The Capital and Operating Article Requests for FY87 were reviewed. <br />#840,000 was requested for Street Acceptance; with a $0 recommendation <br />by the Manager. <br />Mr. Eddisonb felt that at least two streets a year should be.accepted <br />for a sense of progress with that program and to decrease the back -log, <br />Under Street Reconstruction, $125,000 for improvements to East Street, <br />was requested, with a $0 recommendation by the Town Manager. <br />Mr. Hamburger, resident of that area and TMMA Member, suggested that <br />installation of sidewalk could solve the problem by providing added width <br />and saving trees. This suggestion will be discussed further. <br />Mr. Hutchinson recommended in favor of the #700,000 requested for <br />Street Resurfacing which in addition to State funds would result in an <br />$850,000 appropriation. <br />Hr recommended $0 funding for Uncompleted Subdivision Streets for which <br />$310,000 is requested. <br />He a lso approved of re quests for funds for Sewer Pump Station Energy <br />Improvement ($125,000) and for Infiltration /Inflow Removal {3100,440}. <br />There were no capital requests under the following categories: <br />Sewer System Improvement <br />Water Mains /Fire Flows <br />Storm Drains <br />Brook Reclamation <br />201 Bedford Street Reroofing <br />Westview Cemetary <br />The Capital Expenditures Committee asked for an update on the status of <br />the brook cleaning program. Mr. Tonaszuck listed projects planned. <br />Under dater Mains /Water Quality, $220,000 was requested with a <br />recommendation of $200,000 by the Manager. <br />He recommended $0 for Curbing, which had $50,000, requested. <br />The Manager recommended favorably on the following requests: <br />New Sidewalks, $50,000 <br />Replacement Sidewalks, $84,000 <br />Parking Lot Operation /Maintenance, $112,000 <br />Replacement of Town Oil Tanks, $15,000 <br />Hill Street Traffic Lights, $80,000 <br />