Laserfiche WebLink
- 4 - <br />Street Re- Upon motion duly mace and seconded, it was voted to award the contract <br />surfacing for street resurfacing # - -1 -E in the amount of $182,906 to P. J. Keating <br />Contract Co., Reservoir Road, Lunenburg, Mass. <br />OATV The Chairman opened the hearing on the petition of the Adams /Russell <br />Hearing Co., Inc. for permission to install underground cables for village Circle, <br />Sanderson Road, Mason Street, White Pine Lane, Apollo Circle, Bushnell Drive, <br />Maureen Road, Brookwood Road, Fairfield Drive, ' a1 Park Circle, Todd Road, <br />Bowser Road,... Saddle Club Road., Patriots Drive and Brigham Road necessary to <br />provide service cable-television. <br />Mr. John Castro, Director of Construction and Development for the Adapts/ <br />Russell Co. introduced Nor. Rick Perrone, 'resident of Xcel Construction Co. <br />of Connecticut, the firm that will be doing the construction work. After <br />reviewing a film that was shat at Potter Pena during the actual lying of the <br />cables there, Mr. Perrone and Mr. Castro answered questions from the audience. <br />Concerns were expressed regarding other underground utility services now in <br />place, preservation of shrubs and trees and the necessity and placement of <br />the "Junction boxes" necessary to service every two houses. <br />Mr. Larry Hall, 10 Patriots Drive, addressed the Board and stated that <br />11 of the 12 homeowners on Patriots Drive indicated to him that they did not <br />want to subscribe to the cable service. He stated that he felt that it was <br />not economical nor fair-to install the cables for that one household. He <br />expressed concern regarding damage to large, old trees in the area, also. <br />Mr. Busa stated that because of legalities involved in this matter regarding <br />the installation of the cables to service one household, the decision would <br />be deferred until the August 9 hearing for the remaining precincts. Resi- <br />dents of Patriots Drive 'would uld be welcome to attend that hearing also. <br />Upon motion duly made and seconded., it was voted to grant permission <br />to Adams /Russell Co., Inc. for permission to install underground cables <br />for village Circle, Sanderson Road, Mason Street, White Pine Lane, Apollo <br />Circle, Bushnell Drive, Maureen road, Brookwood Road, Fairfield Drive, <br />Oak Park Circle, Todd Road, Bowser Road, Saddle Club Road and Brigham Road <br />to provide service f or cable television. <br />Mr. Castro and Mr. Perrone thanked the Board and they retired from the <br />meeting. <br />Commuter Upon motion duly made and seconded, it was voted to award the contract <br />Bus Con- for the commuter bus to the Gray Line of Boston for a three- period to <br />tract expire on July 31, 1985 with the following rate structure; <br />Single ride 2.50 <br />Round trip , 0 <br />20 tickets 40.00 <br />Monthly 77.00 <br />LEXPRESS Mrs, Castleman, Chairman of the Transportation Advisory Committee ex- <br />plained to the Board the Committee's rationale for requesting the installa- <br />tion of barrier posts at the LEXPRESS stop in Depot Square. She stated that <br />the Committee had looked into other locations as the site for the bus ter - <br />minal., but-found that Depot Square was the most suitable and efficient. <br />The concern for the Committee was for the safety of the passengers while <br />boarding and disembarking the busses. <br />Now <br />mod <br />