- 4 -
<br />Street Re- Upon motion duly mace and seconded, it was voted to award the contract
<br />surfacing for street resurfacing # - -1 -E in the amount of $182,906 to P. J. Keating
<br />Contract Co., Reservoir Road, Lunenburg, Mass.
<br />OATV The Chairman opened the hearing on the petition of the Adams /Russell
<br />Hearing Co., Inc. for permission to install underground cables for village Circle,
<br />Sanderson Road, Mason Street, White Pine Lane, Apollo Circle, Bushnell Drive,
<br />Maureen Road, Brookwood Road, Fairfield Drive, ' a1 Park Circle, Todd Road,
<br />Bowser Road,... Saddle Club Road., Patriots Drive and Brigham Road necessary to
<br />provide service cable-television.
<br />Mr. John Castro, Director of Construction and Development for the Adapts/
<br />Russell Co. introduced Nor. Rick Perrone, 'resident of Xcel Construction Co.
<br />of Connecticut, the firm that will be doing the construction work. After
<br />reviewing a film that was shat at Potter Pena during the actual lying of the
<br />cables there, Mr. Perrone and Mr. Castro answered questions from the audience.
<br />Concerns were expressed regarding other underground utility services now in
<br />place, preservation of shrubs and trees and the necessity and placement of
<br />the "Junction boxes" necessary to service every two houses.
<br />Mr. Larry Hall, 10 Patriots Drive, addressed the Board and stated that
<br />11 of the 12 homeowners on Patriots Drive indicated to him that they did not
<br />want to subscribe to the cable service. He stated that he felt that it was
<br />not economical nor fair-to install the cables for that one household. He
<br />expressed concern regarding damage to large, old trees in the area, also.
<br />Mr. Busa stated that because of legalities involved in this matter regarding
<br />the installation of the cables to service one household, the decision would
<br />be deferred until the August 9 hearing for the remaining precincts. Resi-
<br />dents of Patriots Drive 'would uld be welcome to attend that hearing also.
<br />Upon motion duly made and seconded., it was voted to grant permission
<br />to Adams /Russell Co., Inc. for permission to install underground cables
<br />for village Circle, Sanderson Road, Mason Street, White Pine Lane, Apollo
<br />Circle, Bushnell Drive, Maureen road, Brookwood Road, Fairfield Drive,
<br />Oak Park Circle, Todd Road, Bowser Road, Saddle Club Road and Brigham Road
<br />to provide service f or cable television.
<br />Mr. Castro and Mr. Perrone thanked the Board and they retired from the
<br />meeting.
<br />Commuter Upon motion duly made and seconded, it was voted to award the contract
<br />Bus Con- for the commuter bus to the Gray Line of Boston for a three- period to
<br />tract expire on July 31, 1985 with the following rate structure;
<br />Single ride 2.50
<br />Round trip , 0
<br />20 tickets 40.00
<br />Monthly 77.00
<br />LEXPRESS Mrs, Castleman, Chairman of the Transportation Advisory Committee ex-
<br />plained to the Board the Committee's rationale for requesting the installa-
<br />tion of barrier posts at the LEXPRESS stop in Depot Square. She stated that
<br />the Committee had looked into other locations as the site for the bus ter -
<br />minal., but-found that Depot Square was the most suitable and efficient.
<br />The concern for the Committee was for the safety of the passengers while
<br />boarding and disembarking the busses.
<br />Now
<br />mod
<br />
|