Laserfiche WebLink
- <br />Developer and Financier: Dean B. Comeau, (General Partner), Prank. L. <br />Farrington, Jr, (General. Partner) , M. Vance <br />Munro, (General Partner <br />Planner, Architects, Interchange Bulent I. Kastarlak, Brian K. <br />Landscape Architects: Barber, J. Walter Brain <br />S tructural Engineer: Souza & True <br />General Contractor: E. A. Comeau, Inc. <br />Concept: Two categories: Below Market bate Uses and Market Rate Uses <br />Mr. Kastarlak explained the concept of the "Below Market Rate Uses" <br />as being .internally subsidized ed with revenues generated by the "Market Rate <br />Uses. The ' Be l ow Market Rate Uses" woul include a senior center, <br />units for congregate elderly housing which would be optional and elderly <br />related social services. The "Market Rate Uses" would be for a health and <br />fitness center, cafeteria, medical support facility, conference and art <br />center and offices. Mr. Iastarlak explained the site plans ire detail which <br />called for all parking in the rear of the building. The front of the build- <br />ing would remain the sane but there would be an "L" shaped addition to the <br />existing shop to create a senior center which would be totally independent <br />in itself and totally exposed to sunlight, air and landscape. He explained <br />the uses of the building floor by floor. The third floor would be used <br />for the congregate living quarters which would have optional kitchenette <br />and would have congregate living and dining areas. <br />Ir. Comeau stated that because of the complexities of use they would <br />expect the Town to work with them regarding the actual design of the build - <br />Ing etc. He stated that they would work with the Town on any traffic study <br />required for the project and it is estimated that approximately 130 vehicles <br />would be coming-in and out during peak, hours between 8:00-9:00 A.M. � <br />After discussion, the Board voted to go into Executive Session. <br />Upon motion duly made and seconded, it was voted 5-0, by roll. call ..: <br />vote, Mr. Busa, Mrs. Battzn, Mrs. Miley, Mr. Crain and Mr. Pol.iti, to go <br />into Executive Session for the purpose of discussing the sale, lease'or <br />transfer of real estate. <br />After discussion, the open Session was resumed. <br />Developer: Elgin Associates <br />Contractor: Sid Kumins, Inc. <br />Architect: Gillespie, Haring, Phillips Architects, Inc. <br />C onsulting Engineers: Structural: Schoenfeld Associates; <br />Mechanical: Fit emeyer & Tocci <br />Electrical: Bra tiotis & McConnell <br />Lighting: William M. C. Lary <br />Construction: George.Millman Construction Engineering Consultant <br />Eng, & Estimator <br />Concept: office space with a senior center, <br />Mr. Don Gillespie, architect, explained the proposed landscaping and <br />occupancy of the building. The senior center would be on the first floor <br />and the top floor would not be utilized except for storage. The center <br />would open onto a court yard and include a. reception area and cafeteria. <br />total space would be 12,000 sq. ft. The remainder of the building would be <br />designed for executive offices for lease at this time. <br />Mr. ,John Gallagher explained that, as the firm was a partnership, <br />there are tax losses involved and would like to retain the tax losses on <br />