Laserfiche WebLink
— "Plot Plan of Land"; Sheet 1 and 2 of 2; Prepared by: Sullivan Engineering Group, LLC; <br /> Stamped and signed by: John D. Sullivan III, PE Civil No. 41586 and Paul J. Finocchio, <br /> PLS No. 36115; Scale: 1"=20' and as noted not to scale; Date: 2/18/21 <br /> — "WPA Form 3-Notice of Intent" application and attachments; Prepared by: Sullivan <br /> Engineering Group, LLC; Prepared for Applicant/Property Owner: Chung Lai Lai; <br /> Signed by: Chung Lai Lai and John D. Sullivan; Date: 3/5/21 <br /> — "Stormwater Analysis"; Prepared by: Sullivan Engineering Group, LLC; Signed by: John <br /> D. Sullivan III, PE Civil No. 41586; Date: 3/1/2021 <br /> Mr. Jack Sullivan, PE with Sullivan Engineering Group, presented before the Commission. The <br /> property owner is seeking to demolish a portion of the existing house and construct a new <br /> addition off the rear of the house, including steps within the 100 foot buffer zone. Mr. Sullivan <br /> added that the closest point from the Bordering Vegetated Wetland to the overhang and gutters is <br /> approximately 56 feet and no trees are being removed. Roof runoff will be managed by 4 inch <br /> drains to a Cultec recharge system. <br /> Questions and Comments from the Commission: <br /> — The elevation is lower in the backyard than where the wetland flags are. Do you have the <br /> wetland delineation data sheet as requested? <br /> — There is a small tree that will be removed and not shown on the plan. It is a small cedar <br /> shrub not more than 4 inches but is present. <br /> — Would like to see Feno markers. <br /> — Should there be restoration as part of the lawn in the 25 foot buffer zone? <br /> Responses from the Representative: <br /> — The data sheet is being prepared by Norse Environmental Services and should be <br /> complete by mid-week. <br /> — Did not talk to the property owner about additional restoration but can discuss. <br /> Ms. Ladd stated that the delineation is inside an area where the trees are and Ms. Samuels asked <br /> if there is an area that could be restored instead. Mr. Sullivan responded there would still be <br /> enough lawn and could put a mix of plants and shrubs on the plan to show at the next meeting. <br /> Mr. Hamilton stated that it is wetlands soil whether or not it is part of the lawn, and he would <br /> like to review the data sheet from Norse Environmental Services to confirm where the soil <br /> samples were taken from. <br /> The Engineering report states that"more than two feet of separation was not provided between <br /> ESHGWT and the bottom of the infiltration chambers". Ms. Mullins clarified that typically it is <br /> supposed to be 4 feet and could go down to 2 feet, and that the Town Engineer will likely require <br /> mounding if it does not meet the separation requirements. <br /> On a motion by Mr. Beuttell and seconded by Ms. Ladd, the Commission voted 7-0 by roll call <br /> vote to continue the hearing to the April 12, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> 4 <br />