|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-03-23-CPC-ATM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Community Preservation Committee-CPC
>
Minutes
>
2021
>
2021-03-23-CPC-ATM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 8:35:03 AM
Creation date
3/3/2021 8:35:22 AM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Report - CPC - Community Preservation Committee- 2021 Annual Town Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 10 (d) <br />Project: Playground Enhancements - Pour -in -Place Surfaces <br />at Harrington Elementary School <br />CPA Category: Recreational Resources <br />Amount Requested: $ 150,000 <br />Amount Recommended: $ 150,000 <br />CPC Vote: (8-0) <br />Project Description: <br />This FY22 request will fund the safety surfacing replacement at the Harrington Elementary <br />School playground with Pour in Place (PIP) safety surfacing. Currently the school has a <br />playground that uses engineered wood fiber for safety surfacing. Engineered wood fiber is not <br />stable and is regularly washed out or kicked out while using the playground equipment. When <br />this occurs, the impact -absorbent surfacing requirement of 12 inches is no longer being met. PIP <br />safety surfacing is a rubber/urethane product that drains extremely well and aides in melting <br />snow. The PIP safety surface will remain at the minimum required safety depth of 12 inches <br />since the product material does not get washed out or kicked out with use. <br />Project Goals and Objectives: <br />• Update and replace current safety surfacing with new, modern PIP safety surfacing; <br />• Increase safety and usability of the playground year round; <br />• Maintain the impact -absorbent surfacing safety requirement depth of 12 inches; and <br />• Prolong the duration of the playground's usability. <br />Project Benefit: <br />If existing safety surfacing materials are left in place, the playground will continue to require an <br />annual supplement of wood fiber, raking over the holes and general clean up from the walk off <br />by users. PIP safety surfacing requires little to no annual maintenance and has a use expectancy <br />of 15 years. <br />Funding Request: <br />$150,000 is requested in FY22. Subsequent requests are anticipated in FY23 - FY25 for similar <br />upgrades to the safety surfacing at the Estabrook, Fiske and Bowman playgrounds. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.