Laserfiche WebLink
ARTICLE 10 (d) <br />Project: Playground Enhancements - Pour -in -Place Surfaces <br />at Harrington Elementary School <br />CPA Category: Recreational Resources <br />Amount Requested: $ 150,000 <br />Amount Recommended: $ 150,000 <br />CPC Vote: (8-0) <br />Project Description: <br />This FY22 request will fund the safety surfacing replacement at the Harrington Elementary <br />School playground with Pour in Place (PIP) safety surfacing. Currently the school has a <br />playground that uses engineered wood fiber for safety surfacing. Engineered wood fiber is not <br />stable and is regularly washed out or kicked out while using the playground equipment. When <br />this occurs, the impact -absorbent surfacing requirement of 12 inches is no longer being met. PIP <br />safety surfacing is a rubber/urethane product that drains extremely well and aides in melting <br />snow. The PIP safety surface will remain at the minimum required safety depth of 12 inches <br />since the product material does not get washed out or kicked out with use. <br />Project Goals and Objectives: <br />• Update and replace current safety surfacing with new, modern PIP safety surfacing; <br />• Increase safety and usability of the playground year round; <br />• Maintain the impact -absorbent surfacing safety requirement depth of 12 inches; and <br />• Prolong the duration of the playground's usability. <br />Project Benefit: <br />If existing safety surfacing materials are left in place, the playground will continue to require an <br />annual supplement of wood fiber, raking over the holes and general clean up from the walk off <br />by users. PIP safety surfacing requires little to no annual maintenance and has a use expectancy <br />of 15 years. <br />Funding Request: <br />$150,000 is requested in FY22. Subsequent requests are anticipated in FY23 - FY25 for similar <br />upgrades to the safety surfacing at the Estabrook, Fiske and Bowman playgrounds. <br />11 <br />