|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-03-23-CPC-ATM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Community Preservation Committee-CPC
>
Minutes
>
2021
>
2021-03-23-CPC-ATM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 8:35:03 AM
Creation date
3/3/2021 8:35:22 AM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Report - CPC - Community Preservation Committee- 2021 Annual Town Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 10 (b) <br />Project: Park and Playground Improvements- South Rindge <br />Avenue <br />CPA Category: Recreational Resources <br />Amount Requested: $ 170,000 <br />Amount Recommended: $ 170,000 <br />CPC Vote: (8-0) <br />Project Description: <br />This FY22 request will fund the update and replacement of playground equipment and safety <br />surfacing at the park on South Rindge Avenue. Signage, park benches, trash receptacles and a <br />bike rack will also be updated or replaced in addition to the installation of fencing around the <br />playground. The playground equipment was last replaced in 2005. The proposed improvements <br />will renovate and rehabilitate existing safety surfacing and equipment so that the site will be in <br />compliance with standards set by the Consumer Product Safety Commission (CPSC), the <br />American Society for Testing and Materials (ASTM) and the Americans with Disabilities Act <br />(ADA). Additionally, at the recommendation of the 2017 ADA Compliance Study, the walkway <br />leading to the playground will also be renovated to meet minimum width regulations. An <br />accessible path leading to the Arlington Reservoir Trail and a connection to the basketball courts <br />will also be installed. <br />Project Goals and Objectives: <br />• Update and replace current playground equipment with new, up-to-date systems; <br />• Create an accessible route and path; <br />• Install a new bike rack, park benches, trash receptacles, fencing and signage; and <br />• Comply with CPSC, ASTM and ADA standards. <br />Project Benefit: <br />As existing equipment continues to age and deteriorate, more frequent repairs, maintenance and <br />equipment removal will be needed to ensure that the structures remain safe for all users. A total <br />replacement will prevent such costly repairs and maintenance. <br />Funding Request: <br />The FY22 request is $170,000. Subsequent FY23-FY26 requests are anticipated for similar <br />playground replacements at Kinneens Park, Justin Street Park, Lincoln Park and the Center <br />Playground at the Center Recreation Complex. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.