Laserfiche WebLink
Referencing the Memo provided by the Engineering Department,there are questions on the <br /> construction schedule and they are concerned about a new water line that is not shown on the <br /> plans. Also, the Engineering Department would like to be included in the coordination of work <br /> as there are other projects going on in the area. Ms. Weisman responded saying that they will <br /> discuss with the Engineering Department and also confirm the location of the water main as well. <br /> On a motion by Mr. Langseth and seconded by Mr. Beuttell, the Commission voted 7-0 by roll <br /> call vote to continue the hearing to the January 19, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 8:02 PM (1:25:30 for LexMedia Recording) <br /> ViewPoint Cloud Permit# CN0I-20-35, DEP#201-1206 <br /> Notice of Intent, 20 Ingleside Road <br /> Applicant: Richard F. Perry Family Trust <br /> Project: raze and rebuild a single-family dwelling and associated site appurtenances. Portions of <br /> the proposed activities are located within the 100-foot Buffer Zone to Bordering Vegetated <br /> Wetlands (BVW). <br /> Documentation Submitted.- <br /> - <br /> ubmitted:— 20 Ingleside Road Planset; Sheet 1, 2 and 3, of 3; Prepared for: RFP Family Trust; <br /> Prepared by: Meridian Associates; Scale: 1"=20' and NTS; dated December 14, 2020 <br /> — "Notice of Intent Application and Wetland Resource Area Analysis"; Prepared by LEC <br /> Environmental Consultants Inc; Prepared for: Richard F. Perry Family Trust; dated <br /> December 15, 2020 <br /> o "WPA Form 3- Notice of Intent" application; signed and dated December 9, 2020 <br /> o Figure L USGS Topographic Quadrangle <br /> o Figure 2: FEMA Flood Insurance Rate Map <br /> o Figure 3: MassGIS Orthophoto &NHESP Estimated Habitat Map <br /> o "Wetland & Buffer Zone Mitigation Planting Plan"; dated December 10, 2020; <br /> Prepared by LEC Environmental Consultants, Inc. <br /> — "Stormwater Analysis and Calculations"; Prepared for: RFP Family Trust; Prepared by: <br /> Meridian Associates; Dated December 14, 2020 <br /> — "Operation and Maintenance Program"; Prepared for: RFP Family Trust; Prepared by: <br /> Meridian Associates; Dated December 14, 2020 <br /> Mr. Richard Kirby, Wetland Scientist with LEC Environmental, and Michael Capachietti, <br /> Project Engineer, presented before the Commission. The applicant is proposing to raze and <br />