Laserfiche WebLink
5 <br /> -Referring to the engineering report,the word `negligent' should have been <br /> `negligible' <br /> -Witnessed plastic-covered erosion control during a site visit, this is something the <br /> Commission does not allow. <br /> -If the erosion control is acting as more temporary and will be removed, it is <br /> harder to use because it doesn't hold up and needs to be changed a lot. <br /> -If under bridge, concerned about trapping the animals. <br /> Responses of the Applicant: <br /> -Additional erosion control has been placed. <br /> -Material [plastic] can and will be removed prior to filing the COC. <br /> -This is off to the east,just a temporary measure until plants are installed. <br /> -Does not extend under the bridge. <br /> -The entire site drains down to the cross culvert, crossing under Brookhaven <br /> driveway at Waltham Street. All contributing areas discharge to that location. <br /> Mr. Langseth stated that CB-3 is a constructed watershed, created by the project, and he <br /> would be okay with waiving the normal requirements. Mr. Langseth then asked what is <br /> preventing them from fully complying with no increase in rate for CB-3 and CB-4. Mr. <br /> Borrebach responded saying that it is possible to add additional units to infiltrate at CB-4 and <br /> could be done if asked to do so. Mr. Langseth was in favor of requiring an additional row of <br /> infiltrators. <br /> It was stated that there is a net reduction shown on the drain summary chart. There is an <br /> increase relative to the original submittal, however it is still exceeding requirements of the <br /> bylaw just by a less amount than what was originally approved. <br /> On a motion by Mr. Langseth and seconded by Ms. Dohan, the Commission voted 6-0 by roll <br /> call to Approve the Amendment to Order of Conditions. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> ViewPoint Cloud 4CDOA-20-27 <br /> Request for Determination of Applicability, 378 Woburn Street <br /> Applicant: Charles DeFrancesco <br /> Project: Remove vegetation and site grading and landscaping associated with the demolition <br /> and reconstruction of a single-family dwelling within the 100-foot buffer zone of a Bordering <br /> Vegetated Wetland <br /> Documentation Submitted: <br />