Laserfiche WebLink
4 <br /> from addresses the issue, or not until the neighbor removes it. Mr. Michael Reamer stated <br /> that the bylaw does not require the person who plants the bamboo to contain it unless it <br /> reaches 4 feet from the lot line. The bylaw also does not require the town to penalize the <br /> homeowner,just that they may, and that it assumes people will act in good faith. Mr. Reamer <br /> feels that it would be helpful for the Conservation Commission to make a statement that the <br /> spread of running bamboo is a problem. Existing bamboo will be grandfathered in and there <br /> would be no constraint on its trespassing and no enforcement penalty. Ms. Mullins asked how <br /> the bylaw would address the existing 10 properties and whether or not the town would be <br /> responsible for the removal. Mr. Reamer responded saying that it would be the responsibility <br /> of the property owner to remove it, never the town. If it trespasses again, then the owner of <br /> the property where it came from would be subject to the enforcement. <br /> On a motion by Mr. Langseth and seconded by Ms. Ladd, the Commission voted 6-0 by roll <br /> call to support a statement that the Commission recognizes that running bamboo is a problem <br /> where it exists and does not oppose measures to control it, but favors prohibiting it instead. <br /> In the interest of time for the attendees, the remaining New Business/Pending Matters will be <br /> discussed towards the end of the meeting. <br /> 7:17 PM (44:20 for recorded meeting provided by LexMedia) <br /> 7:00 PM New Public Meetings/Hearings <br /> ViewPoint Cloud 4AOOC-20-8, DEP 201-1066, BL 1023 <br /> Amendment to the Order of Conditions, 1010 Waltham Street <br /> Applicant: Brookhaven at Lexington Inc. <br /> Project: Construct 11 additional parking spaces along with required stormwater management <br /> system improvements to mitigate for the increase in impervious surfaces on the site. <br /> Documentation Submitted: <br /> -960-1010 Waltham St AOOC Comments, Michael Sprague, dated 9/17/2020 <br /> -Parking Expansion Response, Kyle Burchard, P.E., dated 9/24/2020 <br /> -Stormwater Management Analysis, prepared by Goldsmith, Prest& Ringwall, <br /> Inc., dated 7/14/2020 <br /> -Supplemental Parking Minor Site Plan, prepared by Goldsmith, Prest& <br /> Ringwall, Inc., dated 8/21/2020 <br /> -Cover Letter, Application for Amended Order of Conditions, James R. <br /> Borrebach, P.E., L.S.P., dated 9/l/2020 <br /> Jim Borrebach, President of OHI Engineering, Inc., presented to the Commission, proposing <br /> an additional 11 parking spaces (5 just south of the new driveway that serves the expansion <br /> and 6 at the other location). Mr. Borrebach stated that the designed infiltration areas capture <br /> roof runoff to deal with the addition of impervious surfaces, and that there is an overall <br /> decrease of rate and volume. <br /> Concerns of the Commission: <br />