Laserfiche WebLink
N/Hke C:further darffied that the Ianguage for the Red Ust under the FOL (Fawn of Lexungton) <br /> SustaOnaUHty goAs Os to s t..rl V..e..for cornp�Oance. It Os therefore not a definffive requOrernent for fuH <br /> cornp�Oance. <br /> Matt S stated that Ns wHII requore rnore coorcfinaflon woth our spedficaflon wroter and that we wHII <br /> need to engage her ea6er On the process that we tracfiflonaHy wouH. rhe desOgn Learn anfldpates <br /> that we wHII have a draft rnatrux fled to the spedficaflons around the rn0cfle of I.)esugn <br /> Deveoprnent. r o0y cfi0suon that wHII not be cfiscussed untH a Iater date us cfi0suon 12, furnLure. <br /> these s6ecflons wHII not need to be made untH the buHcfing us under construcflon. We wHII track <br /> these rnaterUs separat6y and cornUne onto a finaIl report that wHII be part of the cc: nstrucflon <br /> doseout docurnentaflon. <br /> CONCLUSION ON HOW TO PROCEED WITTH RED LIST COMPLIANCE <br /> Red List Process <br /> Objective: To maximize the health and well-being of the building occupants of the proposed Police Station <br /> project. <br /> Approach: <br /> The Consultant Team will take their normal specification and make it project specific thus establishing <br /> the Baseline specification for all divisions of the project. <br /> The Baseline Specification for the project will then be checked against the-Red List Database to <br /> illustrate what materials are compliant as currently specified. If a material is not compliant, the <br /> consultant team will see if the list offers a suggested alternate material that will allow for <br /> compliance. In both cases anticipated impacts to performance, resilience or budget will be <br /> reported for review to DPF, PBC and the Integrated Design Team. <br /> 1 —The Consultant team will pay particular attention with the following divisions; 4— Masonry, 7, <br /> Thermal envelope and sealants, 9 — Finishes, and 12 Furnishing, as these divisions are anticipated to <br /> have the most impact on the building occupants. If any materials within these divisions are not listed in <br /> the Red List database, we will look for alternative solutions and / report if we cannot comply for a <br /> specific product. <br /> 2—The next threshold to investigate would be any materials known to have impact to the interior <br /> environment that are outside of the 4 divisions referenced above. <br /> 3 —The Consultant Team will create a matrix summary of materials and findings for the Town's future <br /> use on other projects. <br /> 4—The Consultant <br /> will review the Town of Lexington's Sustainability Plan list of chemicals that are to be excluded from the <br /> project as well as other suggested State resources that are referenced in the Towns Policy. <br /> PBC Meeting 12.03.19 3 <br />