Laserfiche WebLink
- Stormwater Analysis & Calculations prepared by Meridian Associates, dated October 28, <br /> 2019 <br /> - "Notice of Intent Application and Wetland Resource Area Analysis"prepared by LEC <br /> Environmental Consultants, Inc., dated October 29, 2019 <br /> - Plans entitled "Permit Site Plan of Land"prepared by Meridian Associates, dated <br /> November 18, 2019 <br /> - Engineering Memo from Michael Sprague, Engineering Dept., dated November 8, 2019 <br /> Mr. Richard Kirby, wetland scientist with LEC Environmental, Mr. Mike Capachietti, project <br /> engineer and Mr. Ben Finnegan presented before the Commission. The applicant is proposing to <br /> demolish and rebuild a single family dwelling with portions of the dwelling within the 50 foot <br /> buffer zone. A stone wall is proposed to be rebuilt along the 25 foot buffer zone. Per the <br /> Commission's request the applicant has provided a table showing the changes in impervious <br /> surface area. <br /> Concerns of the Commission: <br /> The Commission asked that FENO markers be installed before the stone wall is re-constructed as <br /> a special condition. <br /> The Commission asked if the dwelling could be relocated to be further away from the resource <br /> areas. <br /> Responses of the Applicant: <br /> The applicant was not able to pull the dwelling further away from the wetland due to the grading <br /> of the lot. <br /> On a motion by Mr. Beuttell and seconded by Ms. Dohan the Commission voted 6-0 to close the <br /> hearing. <br /> 8:30pm <br /> Continued Public Meetings/Hearings <br /> DEP 201-1137 BL 1094 <br /> NOI Cont. Hearing, 127 North Street <br /> Applicant: Ying Chen and Katherine Van Stry o/b/o Bull Realty, LLC <br /> Project: Raze and rebuild of a single family dwelling <br /> On a motion by Ms. Ladd and seconded by Ms. Dohan, the Commission voted 6-0 to continue <br /> the hearing until January 271h, 2020 at the applicant's request. <br /> DEP 201-1162 <br /> Viewpoint Cloud Record 4: CNOI-19-17 <br /> NOI, 0 Hartwell Avenue (Hanscom Field) <br /> Applicant: Massport <br /> Project: Vegetation Management within wetland resource areas <br />