Lexington Home Page
|
Help
|
About
|
Browse
Search
2019-05-02-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2019
>
2019-05-02-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 1:34:24 PM
Creation date
11/5/2019 1:34:22 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project may not achieve the LEED criteria for Daylight but will the design will utilize daylight <br /> wherever possible to reduce lighting loads and improve energy performance. <br /> REGIONAL PRIORITY <br /> L Lex 7: Resilience <br /> The new Police Station will serve as an emergency facility and will be able to withstand a Category 4 <br /> hurricane and as well as other threats. The building will be able to provide shelter and refuge to <br /> citizens in case of an emergency. <br /> The Lexington I BDP prioritized resilience in all new construction. The team discussed the various <br /> ways resilience should be considered. Examples included extreme weather events and increased <br /> temperatures and humidity due to climate change. Back-up generators will be sized to meet the <br /> energy needs of the building. <br /> Jon H. inquired about items on the Policy that we want to deal with related to the project. Schedule <br /> states starting schematics; will there be time to review. <br /> Jeff stated he is expecting to meet some of these goals. Extensive dialog needed, massing of <br /> building and solar discussions. Cannot wait too long if we want to keep to the 3 month schedule. <br /> Mike C. stated maybe 3 months isn't the right amount of time for schematic design. Maybe more <br /> time is needed. Jeff was in agreement with this. <br /> Mike C. stated communication needs to happen both ways. Questions can be sent to Mike who will <br /> relay them to the design team. <br /> It was stated that all understand they need to keep their boards/committees informed and should <br /> meet on a monthly basis. <br /> Chris S. thanked all tonight in attendance. <br /> Motion to adjourn was made and seconded: Meeting adjourned at 8:45pm. <br /> PBC Meeting 05.02.19 4 <br />