Laserfiche WebLink
8 <br /> Project: Amendment to approve changes to impervious surface and stormwater management <br /> Mr. Fred Russell presented before the Commission. Mr. Russell stated that the house was <br /> built approx. 130 sq. feet larger than approved. This was due to the gutters. The infiltration <br /> system is still adequate for the additional square footage. A portion encompassing about 120 <br /> square feet of the driveway was re-graded incorrectly. The drainage analysis shows that the <br /> standards were still met. <br /> Chairman Hamilton read the engineering memo into the record. <br /> Ms. Ladd asked if Mary Trudeau had provided anything. <br /> Mr. Russell confirmed that she submitted a report. <br /> On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 7-0 to close <br /> the hearing. <br /> Continued Public Meetings/Hearings <br /> DEP #201-1126 BL 1083 <br /> NOI, 6 Blinn Road <br /> Applicant: Lauren Dillon <br /> Project: Proposed raze and rebuild of a single family dwelling <br /> Molly Obendorf, Wesley Leighton and Lauren Dillon presented before the Conservation <br /> Commission. Ms. Obendorf stated that the applicants presented before the Zoning Board of <br /> Appeals and were issued a 5 foot variance. This allows the dwelling to be moved into the <br /> front yard setback by five feet. Ms. Obendorf continued to address a previous question <br /> pertaining to temporary and permanent impacts which they have provided with a table of <br /> values. A restoration area is proposed to take place between the current edge of lawn and <br /> delineated wetland boundary. Ms. Obendorf stated that they provided the final engineering <br /> details. <br /> Chairman Hamilton stated that the applicant should provide a planting plan to be approved at <br /> a later time as a condition of the Order of Conditions. The Commission suggested planting <br /> shrubbery at the delineated wetland line. <br /> The Conservation Commission decided to close the hearing and issue the order of conditions <br /> at the same time at the next hearing. <br /> Mr. Bitsko and Ms. Ladd could not vote in the following decision due to too many missed <br /> hearings. <br /> On a motion by Ms. Dohan and seconded by Mr. Beuttell, the Commission voted 5-0 to <br /> continue the hearing until September 3, 2019 at the applicant's request. <br />