Laserfiche WebLink
7 <br /> Mr. Wolk believed that Mr. Kirby was jumping to a conclusion without enough proof. <br /> Chairman Hamilton asked if it would be helpful to conduct a test pit to determine where the <br /> groundwater i s. <br /> Mr. Kirby stated that it would be helpful to turn the sprinklers off and see if the area dries out. <br /> Mr. Kirby stated that the proposed grading is subtle. <br /> Mr. Bitsko stated that it will probably be tough to grade it to that exact height. Water should <br /> be directed out of the area faster. Mr. Bitsko recommended planting trees as a possible way to <br /> absorb the water. <br /> On a motion by Ms. Dohan and seconded by Mr. Beuttell the Commission voted 7-0 to <br /> continue the hearing to September 3, 2019. <br /> 8:09pm <br /> DEP 201-X BL X <br /> NOI, 7 Lois Lane <br /> Applicant: William Keim <br /> Project: Construction of deck and patio <br /> Ms. Cerise Jalelian and Mr. Chris Connelly, the contractor for the project presented before the <br /> Commission. Ms. Jalelian apologized for her mistake in beginning construction. She halted <br /> her work as soon as she was notified and her contractor has been attending Commission <br /> meetings on her behalf during the informal hearings regarding the violation. Ms. Jaelein stated <br /> that she has brought the size of the patio to under 100 square feet. Mr. Connelly stated that the <br /> deck walkway was downsized 3.9 feet. <br /> Mr. Connelly stated that they do have a list of plants from the approved list of plants. <br /> Ms. Ladd asked for details regarding the height of the wall. <br /> Mr. Langseth reiterated that the Commission is not confirming the wetland delineation. <br /> On a motion by Mr. Langseth and seconded by Mr. Beuttell, the Commission voted 7-0 to <br /> continue the hearing until September 3, 2019 at the applicant's request. <br /> 8:30pm <br /> DEP 201-1100 BL 1057 <br /> Amendment to an Order of Conditions, 85 Maple Street <br /> Applicant: Seaver Construction <br />