Laserfiche WebLink
3 <br /> A change was made to the North Building walkway. A one hundred foot section of walkway <br /> was relocated to be adjacent to the road. A fire hydrant will be moved a couple of feet back <br /> and a guardrail will be shortened to accommodate for this. <br /> A water line was proposed to be installed to the outside of a retaining wall. This water line has <br /> now been approved by the town to be installed instead under the sidewalk. <br /> The Town Water Department required a second water meter vault to be installed and looped <br /> into the existing system. <br /> The final change, Mr. Borrebach described was the alteration to the sewer line connection. <br /> The connection was four and a half feet above grade which was higher than anticipated. To <br /> accommodate this they increased the distance between the utility line and the sewer line and <br /> reconnected back to a nearby manhole to get away from the obstructions. <br /> Mr. Borrebach stated that the project will be wrapped up in the next few months. Two <br /> infiltration systems have yet to be installed but that will be the last subsurface activity to take <br /> place. No additional minor changes are expected to be made during the last phase of the <br /> proj ect. <br /> On a motion by Mr. Beuttell and seconded by Mr. Langseth, the Commission voted 6-0 to <br /> approve the insignificant plan change. <br /> Mr. Wolk re joined the Commission. <br /> 7:00 pm <br /> New Public Meetings/Hearings <br /> DEP 201-1149 BL X <br /> NOI, 3 Diamond Road <br /> Applicant: Ellan and Robert Siegel <br /> Project: Addition and Drainage work to a SFD <br /> Jonathan Shuster and Scott Symers presented before the Commission. The homeowners, Mr. <br /> and Mrs. Siegel were in the audience. Mr. Shuster presented a proposed addition that would <br /> be in the place of the existing sunroom. There will be an increase in impervious surface area. <br /> There are two jurisdictional resource areas on the property on either side yards of the <br /> property. A swale and culvert are located on the west side of the property. There are drainage <br /> issues on the site that are proposed to be routed to a rain garden. Safety concerns arise during <br /> wintertime due to the drainage problems. A planting plan has been included in the submitted <br /> filing. <br /> Mr. Smyers stated that there is a history of drainage problems at this site. The outlet to the <br /> sump pump is proposed to be moved further away from the dwelling and street. The existing <br /> stone swale has been there since the homeowners took over the property in the 1990's. Mr. <br />