Laserfiche WebLink
2 <br /> Chairman Hamilton recommended that Mr. Nolasco and the homeowner meet with Ms. <br /> Mullins to remedy the enforcement and determine more details for the replanting. <br /> Enforcement Hearing: 39 Woodbark Circle <br /> Chris Stratford of Stratford Landscaping and the current homeowner, Mr. Hi Yung of 39 <br /> Woodpark Circle presented before the Commission. The enforcement was issued on July 15, <br /> 2019. Mr. Stratford stated that he was contracted to fill in the swale in the rear of the property <br /> that was collecting water and even out the backyard which he did. <br /> Mr. McCarron, the Land Steward had visited the property after the work was completed. <br /> Neither Mr. Stratford nor the homeowner knew if the swale was natural or manmade but Mr. <br /> McCarron determined that the swale should remain. Mr. Stratford stated that the swale only <br /> contained 20 yards of cubic fill from the Hartwell Avenue Compost facility. Mr. Stratford <br /> proposed to return the swale to its original condition. The swale and associated spring only <br /> runs through this property. <br /> Mr. Yung, the homeowner took responsibility for the violation. <br /> Chairman Hamilton asked Mr. Stratford and Mr. Yung to meet with Ms. Mullins to resolve <br /> the violation. <br /> Mr. Beuttell noted that in the enforcement order the resource area is described as a <br /> jurisdictional stream. <br /> Request for Insignificant Plan Change: 1010 Waltham Street DEP 201-1066 BL 1023 <br /> G G <br /> Mr. Wolk recused himself for the discussion of 1010 Waltham Street. <br /> Mr. Jim Borrebach presented before the Commission several minor changes that have been <br /> made during the construction process. The first change was in the position of the chambers. <br /> There was no effect to the stormwater system. The second change was a slight modification in <br /> grading to allow for the diversion of flow. <br /> Mr. Langseth asked if there was an emergency outlet to prevent water backflow. <br /> Mr. Borrebach stated that there is an emergency on that infiltration system. The water <br /> elevation remains the same for before and after a projected 100 year storm event. Mr. <br /> Borrebach stated that the water flows into the basin. <br /> A blast wall was installed near the emergency generator. A walkway was removed where the <br /> blast wall was installed. <br />