|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2780 Memorandum, James Lawrence Carney and Town of Lexington, supplementary conditions, September 19, 1902
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
HISTORIC ARCHIVES (LIMITED TEXT SEARCH)
>
Old Town Papers (individual documents) (formerly TC-48)
>
Schools
>
1900-1909
>
2780 Memorandum, James Lawrence Carney and Town of Lexington, supplementary conditions, September 19, 1902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 1:59:34 PM
Creation date
10/7/2019 10:01:31 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
2780 Memorandum, James Lawrence Carney and Town of Lexington, supplementary conditions, September 19, 1902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Driveia—ys . <br /> Excavate for the drivewkys from the street to the <br /> three entrances and extending to the two turns , as shorn on the plati . <br /> The sub -grade of these driveways Is to be eight inches <br /> below the finished Srade and the road bad is to be wonked to an even <br /> surface parallel to the finished surface . <br /> The finished surface Vill be roundod or crowned four, <br /> inches . <br /> After the sub-grade has been fomedq the road bed is <br /> to be thoroughly rolled with a heavy horse ring-roller, or5,if the <br /> highway superintendent so allows, the town steam Viler, before any <br /> OAA* <br /> material is placed upon it,'aad all places dug out and the spac�s <br /> A <br /> refilled with suitable material to 11-ne of sub-grade and the sur- <br /> faces again rolled until they become hard and compact . <br /> 7,pon taxis sub-grade place a layer of -wome crushed <br /> field stones five Inches deep . No stone in . this layer is to ex;:red <br /> three inches in 4ny dimensions . Ca-Le is to 'be taken to preserve <br /> the crown mid this foundation layer is to be well compacted by roll- <br /> ijig with a ,ieav*,,r roller, and is to be kept in good condition Until <br /> the pavement is put upon .1t, • <br /> A middle layer, of crushed field stonat is to be <br /> placed evenly over the foundation '14jars no a-tone in this layer is <br /> to exceed two inches La any dLmension. Care is to be taken to pro" <br /> serve the crown and the whole is to be watered and thoroughly roll- <br /> ed again with a heavy ring-roller antil the layer is hard Wid aom- <br /> pact , and the surface one inch below the finished grade of drive. <br /> Upon this raiddl� layer after, It is thoroughly con <br /> solidatad, there Is to be spread a finishing layers at least one <br /> inch deep after compacting, of fine crushed field stone screen ingst <br /> composed of stones averaging one half inch in diameter. This <br />
The URL can be used to link to this page
Your browser does not support the video tag.