Laserfiche WebLink
proposed details show that the layers add up to 27 inches. Mr. Gala stated the required <br /> recharge volume is proposed. The groundwater is high in that area so the porous pavement <br /> would be ideal for this project. <br /> Mr. Beuttell stated that the proposed pavement layers are as such for instances where <br /> groundwater is right below the stone layers to provide for water infiltration. <br /> At the applicant's request, on a motion by Ms. Dohan and Mr. Beuttell seconded, the <br /> Commission voted 4-0 to continue the hearing until August 5, 2019. <br /> Continued Public Meetings/Hearings <br /> DEP 201-968 BL 926 <br /> Amendment to an Order of Conditions, Rangeway Extension and SFH Lot <br /> Applicant: Suzanne Raymond <br /> Project: Construction of a roadway, retaining wall and single family dwelling <br /> On a motion by Ms. Beuttell and seconded by Ms. Dohan, the Commission voted 4-0 to <br /> continue the hearing until August 5, 2019, at the applicant's request. <br /> DEP 201-1137 BL 1094 <br /> NOI, 127 North Street <br /> Applicant: Ying Chen and Katherine Van Stry o/b/o Bull Realty, LLC <br /> Project: Raze and rebuild of a single family dwelling <br /> Request to continue until August S, 2019 at the applicant's request. <br /> On a motion by Ms. Beuttell and seconded by Ms. Dohan, the Commission voted 4-0 to <br /> continue the hearing until August 5, 2019. <br /> DEP 201-XXXX BL XXXX <br /> NOI, 758 Marrett Road <br /> Applicant: Minuteman Vocational High School <br /> Project: Construction of synthetic tuft athletic fields <br /> Ms. Michelle Kayersman presented before the Commission. Mr. Eric Roise, Mr. Erik, Mr. Ed <br /> Bouquillon, Ms. Marion Learns sat in the audience. <br /> Ms. Kayersman presented the original filing for the construction and renovation of athletic <br /> fields. The current proposal includes a synthetic football field and track, softball field and <br /> baseball/multipurpose field. Originally the football field was the only synthetic field, currently <br /> the two additional fields are now proposed to be synthetic turf. The parking area has been <br /> revised in shape. Ms. Kayersman showed the proposed impervious vs. pervious surface areas. <br /> There is proposed work inside of the existing roadway. <br /> The proposed drainage system, which is an underground infiltration system, has remained the <br /> same. The same type of drainage system is being proposed for the additional two fields. It is <br />