Laserfiche WebLink
6 <br /> 7:49pm <br /> DET 19-8 <br /> RDA, 33 Hayden Ave <br /> Applicant: Ken Chianca(Boston Properties) <br /> Project: Proposed landscaping and stormwater improvements <br /> Mr. Nick Skoly from VHB presented before the Commission. Mr. Skoly stated that the project <br /> has been scaled back from the original application. This project now will focus on just the front <br /> patio section. The company who occupies the building is Dicerna Pharmaceuticals. The <br /> generator for the project will be double walled and the details regarding the generator were <br /> provided to the Commission. They additionally do wish to reuse the boulder someone on the <br /> property. Removal of trees on the property is still a pending decision, if they decide to remove <br /> any trees then they will come before the Commission again. <br /> Chairman Hamilton read the engineering memo into the record. <br /> Mr. Skoly stated that water control for the property is located in the isolator row. There are <br /> several chambers which are wrapped and contained. There is a two foot sump in the manhole <br /> which allows for cleaning. They will be installing a 6 inch orfice with a plate. <br /> The Commission asked that the construction details for installing the water control measures be <br /> submitted. <br /> On a motion by Mr. Langseth and seconded by Mr. Beuttell, the Commission voted 6-0 to <br /> continue the public meeting to March 11, 2019, at the applicant's request. <br /> DEP 4 201-XXXX BL <br /> NOI, 758 Marrett Road <br /> Applicant: Minuteman Vocational High School <br /> Project: Construction of synthetic tuft athletic fields <br /> Mr. Ed Bouquillon, Mr. Eric Rouser and Ms. Michelle Kayser presented before the Commission. <br /> Mr. Bouquillon stated that they are before the Commission today with a new filing because of a <br /> revision to the proposed athletic fields. They are now proposing to add 6 tennis courts, fixed <br /> seating and restrooms and a new synthetic turf field. It will be a similar layout with similar <br /> resource disturbance. <br /> Ms. Kayser stated that the synthetic field would capture everything though an underground drain <br /> system. In the previous permit they were utilizing existing catch basins and were routing through <br /> existing outlets. Now they are proposing connections though the area drains. The synthetic field <br /> will be routed to a water quality unit before being routed to the existing outlet. All drains will be <br /> routed to Lincoln. They will not be moving the location of the catch basins. Additional erosion <br /> controls will be added to the inside of the road. <br />