Laserfiche WebLink
5 <br /> Mr. Beuttell and Mr. Langseth raised his concern about keeping the pathways porous in terms of <br /> future maintenance. The current grading at 5% may make the porous pavement less effective. <br /> Mr. Zick and Ms. Mullins stated that they will look into alternative options. <br /> Mr. Langseth asked if a geo-technical analysis had been done for the proposed project. <br /> Mr. Zick stated that since the slopes are 3:1 they are not beyond what is typical so a geo- <br /> technical analysis was not done. <br /> Mr. Langseth asked what the proposed vegetation cover is for the steep slope. <br /> Mr. Zick stated that the pollinator seed mix will be applied as the cover. <br /> Mr. Langseth asked if the cut and dab method would be feasible. <br /> Mr. Zick confirmed that it is completely feasible. <br /> A resident, Mr. Jeff Howry voiced his support for this proposed project. <br /> A resident and member of the ADA Committee, Ms. Francine Steiglitz voiced her support to the <br /> project. <br /> Ms. Mullins confirmed that they will explore other alternatives for the project. <br /> On a motion by Mr. Beuttell and seconded by Ms. Ladd, the Commission voted 6-0 to close the <br /> hearing. <br /> 7:42pm <br /> DET 19-9 <br /> RDA, 119 Kendall Road <br /> Applicant: Ana Jaklenec and Daniel Vlasic <br /> Project: Connection of dry well overflow to street storm drain <br /> Mr. Vlasic presented before the Commission. Mr. Vlasic explained the proposed project which <br /> will rectify the current drainage problems in the area. Mr. Vlasic stated that they intend to use a <br /> manhole which is not currently exposed. <br /> Chairman Hamilton reiterated that the project will be to connect the two new, large drywells in <br /> the front of the property to the overflow directed into the street storm drain. <br /> On a motion by Ms. Ladd and seconded by Ms. Ladd, the Commission voted 6-0 to issue a <br /> negative determination with conditions. <br />