|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2019-02-25-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2019
>
2019-02-25-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 12:56:33 PM
Creation date
3/13/2019 10:26:14 AM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Mr. Beuttell and Mr. Langseth raised his concern about keeping the pathways porous in terms of <br /> future maintenance. The current grading at 5% may make the porous pavement less effective. <br /> Mr. Zick and Ms. Mullins stated that they will look into alternative options. <br /> Mr. Langseth asked if a geo-technical analysis had been done for the proposed project. <br /> Mr. Zick stated that since the slopes are 3:1 they are not beyond what is typical so a geo- <br /> technical analysis was not done. <br /> Mr. Langseth asked what the proposed vegetation cover is for the steep slope. <br /> Mr. Zick stated that the pollinator seed mix will be applied as the cover. <br /> Mr. Langseth asked if the cut and dab method would be feasible. <br /> Mr. Zick confirmed that it is completely feasible. <br /> A resident, Mr. Jeff Howry voiced his support for this proposed project. <br /> A resident and member of the ADA Committee, Ms. Francine Steiglitz voiced her support to the <br /> project. <br /> Ms. Mullins confirmed that they will explore other alternatives for the project. <br /> On a motion by Mr. Beuttell and seconded by Ms. Ladd, the Commission voted 6-0 to close the <br /> hearing. <br /> 7:42pm <br /> DET 19-9 <br /> RDA, 119 Kendall Road <br /> Applicant: Ana Jaklenec and Daniel Vlasic <br /> Project: Connection of dry well overflow to street storm drain <br /> Mr. Vlasic presented before the Commission. Mr. Vlasic explained the proposed project which <br /> will rectify the current drainage problems in the area. Mr. Vlasic stated that they intend to use a <br /> manhole which is not currently exposed. <br /> Chairman Hamilton reiterated that the project will be to connect the two new, large drywells in <br /> the front of the property to the overflow directed into the street storm drain. <br /> On a motion by Ms. Ladd and seconded by Ms. Ladd, the Commission voted 6-0 to issue a <br /> negative determination with conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.