Laserfiche WebLink
13 <br /> S177516? <br /> NtiC TOWN OF LEXINGTON <br /> k A Permanent Building Committee <br /> a 3 <br /> A Permanent Members <br /> Lan <br /> ARRILI'Y' , Co-Chairman: Jon Himmel&Co-Chairman Dick Perry <br /> Fx'"G1O Philip Coleman, Charles Favazzo, Carl Oldenburg, Peter Johnson, Howard Hobbs <br /> Project Specific Members <br /> Clarke&Diamond Schools Hastings Elementary Fire Station Visitors Center LCP LCC <br /> Margaret Coppe Curt Barrentine Robert Cunha Joel Berman Teresa Hank <br /> Edwin Goodell Andrew Clarke Joseph Sirkovich Peter Kelly Wilson Manz <br /> December 13, 2018 <br /> Members Present: Jon Himmel, Dick Perry, Philip Coleman, Charles Favazzo, Carl Oldenburg, Curt <br /> Barrentine, Andrew Clarke <br /> DPF Staff: Mike Cronin/Director, Mark Barrett, Ann Marie Ponzini <br /> DPW Staff: Dave Pinsonneault/Director <br /> 6:00 - The meeting was called to order— 201 Bedford Street <br /> 1. Visitor Center Update— Don Millis (Millis Whitaker Architects) <br /> Don informed the committee of the latest project status which included the Massachusetts <br /> Architectural Access Board (MAAB) approval of the Limited Use/Limited Access Elevator, HDC <br /> Hearing scheduled for early January 2019 and 50% CD Pricing for early January 2019. <br /> The project budget is $4,575,000 (hard costs & soft costs), and the bidding period is scheduled <br /> February— March 2019. Construction is slated for May— March 2019. <br /> • Interior layout was reviewed and Historic District Guidelines were discussed. <br /> • The use of an electronic display versus a bulletin board, and a kiosk with built in iPads to <br /> look up area information were discussed. Content for the electronics would have to be <br /> developed. <br /> • Exterior wall materials, lighting, roofing materials and colors were discussed. Other exterior <br /> components such as bike racks, trash cans, benches & cameras will keep the same style as <br /> already seen around town. <br /> A proposed gas duct vent on the exterior of the east side of the building for an Energy Recovery Unit <br /> (ERU) system was discussed. The gas system would only be used during a power outage and is <br /> being proposed to make the building resilient. Gas currently exists on the property. Further <br /> discussion is needed regarding use of gas backup with the Board of Selectman. <br /> Don discussed how the exhibit fabrications will take place. This is a large part of the project <br /> consisting of display cases, cabinets, graphic panels, etc.; with an Exhibit Manufacturer working on <br /> this. <br /> • Furniture package and ways of procuring FF&E's were discussed. <br /> • Construction concerns brought up were the possibility of work at the Battle Green area being <br /> done at the same time, and landscaping at the Visitor Center site in the early spring. <br /> DPW: Some of the Battle area pathways will be put on hold to allow for matching the walkways with <br /> the Visitor Center. <br /> 201 BEDFORD STREET 9 LEXINGTON, MASSACHUSETTS 02420 <br />