|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-12-13-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-12-13-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
3/1/2019 1:55:20 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Don: Mentioned some walkway concerns. He asked for documentation on the approved use of <br /> aggregate for the walkway. <br /> 2. Westview Cemetery <br /> Dave: Informed the committee the AD Hoc Crematory Study Committee had their first meeting. They <br /> will have their next meeting in Jan. 2019. A meeting with the public will also be scheduled. <br /> DPW is still looking to get their building to Spring Town Meeting for approval. <br /> • Need to release the architect now to be ready for Town Meeting and to have design <br /> development documents by the end of Jan. 2019. <br /> PBC: Asked who is doing Justin's estimates. Need to confirm if being done in house or outside. <br /> It was stated Justin will be 90% end of February and 95% at the end of March 2019. <br /> PBC recommends to proceed with design on current schedule and to meet Spring Town <br /> Meeting requirements. Seconded—APPROVED. <br /> 3. Hastings School Update — Michael Burton & Christina Shefferman (Dore & Whittier), Frank Morse <br /> & Brian Bianchi. (Walsh), Donna DiNisco & Vivian Low(DiNisco Designs) <br /> Minutes submitted by Christina Shefferman <br /> Hasting portion of the meeting started at 6:56 PM <br /> 1. Steel Toping Off Ceremony <br /> M. Burton shows MHES steel topping off ceremony video. The video is uploaded to the project <br /> website for further viewing. <br /> 2. D&W Agenda <br /> M. Burton from DWMP outlines the agenda for tonight's meeting. This includes: <br /> GMP Timeline <br /> Final GMP Summary <br /> Construction Budget Comparison/Progression <br /> Construction Analysis <br /> Value Engineering <br /> Approval of Final GMP and VE <br /> 3. GMP Timeline/FSB <br /> M. Burton starts discussion by outlining GMP timeline: <br /> iGMP1-Early Site Package 4/12/18 <br /> IGMP2-Structural Steel and Concrete 5/9/18 <br /> IGMP3-FSB+Elevator, Drywall, Fireproofing 11/8/18 <br /> Final GMP-All remaining Non-FSB 12/13/18 <br /> M. Burton reviews final GMP slide. Final GMP total $8,765,638. Total of iGMP1, iGMP2, IGMP3, and Final <br /> GMP$52,973,418. <br /> PBC Meeting 12.13.18 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.